32 floors · 296,915 sq ft · built 1972 · class O4 · owner of record: 450 Park Fee Owner Lp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 296,915 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 841 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1292). Agency page | Dec 31, 2032 in 2250 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 20, 2024 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.NOTE:AT THE TIME OF INSPECTION OBSERVED RESPONDENT FAILURE TO COMPLY WITH PREVIOUSVIOLATION#35675299R DATED 12/15/2023 AND DOB VIOLATION#121523LL0501SB #35682428J | May 30, 2024 DEFAULT | $12,500 |
| Nov 3, 2017 | Zoning CLASS - 2 VIOLATION OF DISCRETIONARY ZONING CONDITIONS ON PRIVATELY OWNED PUBLICSPACE. NOTED: AT TIME OF INSPECTION NO ENTRY PLAQUE/SIGN INDICATING PUBLIC PLAZA LOCATED AT EAST 57TH ST. ALSO NOTED: AT TIME OF INSPECTION #35297150N | Jan 4, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 3, 2009 | ELEVATOR #9444/305194 | DOB VIOLATION - ACTIVE |
| Dec 6, 2007 | ELEVATOR #9444/229096 | DOB VIOLATION - ACTIVE |
| Jun 26, 2006 | ELEVATOR #9011/164516 | DOB VIOLATION - ACTIVE |
| Feb 21, 2006 | ELEVATOR #9444/154727 | DOB VIOLATION - ACTIVE |
| Jun 26, 2005 | ELEVATOR #9011/164516 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Nov 10, 1999 | ELEVATOR 1P29179 #9012/114464 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 9:14 PM ET. BBL 1012920037.