5 floors · 67 apartments · 54,947 sq ft · built 1910 · class C7 · owner of record: Westfront Associates
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual boiler inspection (6 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-31 (Accepted). Agency page | Dec 31, 2026 in 66 days | 2 of 6 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 54,947 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 759). Agency page | Dec 31, 2029 in 1162 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 13, 2023 | Boilers CLASS - 2 DISCHARGE PIPE MISSING ON BACKFLOW PREVENTOR, CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION #39081305L | May 18, 2023 DEFAULT | $1,562 |
| Mar 13, 2023 | Boilers CLASS - 2 CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION #39081306N | May 18, 2023 DEFAULT | $1,562 |
| Mar 10, 2023 | Construction CLASS - 1 I OBSERVED IN BOILER ROOM IN CELLAR AREA HOT WATER HEATER WITH IMPROPER VENTING.. VENTING IS PITCHED BACKWARDS AND NOT PROPERLY SUPPORT TO TO OF WATER HEATER ALLOWING CARBON MONOXIDE INTO AIR EFFECTING EVERYONE #39081246K | May 18, 2023 DEFAULT | $6,250 |
| Mar 10, 2023 | Construction CLASS - 1 PROHIBITED MATERIAL; I OBSERVED IN CELLAR BOILER ROOM OF LAUNDROMAT HWH.. GAS PIPING WAS REMOVED, RESEALED AND REINSTALLED WHICH IS PROHIBITED AND NOT CODE COMPLAINT AS PER FGC 403.2 STATES THAT USED PIPE AND/O #39081245Z | May 18, 2023 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #28447 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #28448 | DOB VIOLATION - ACTIVE |
| Nov 12, 1996 | CONSTRUCTION #04P02 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 3, 2025 | C | Apt 4A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 9, 2025 |
| Sep 3, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT | Sep 9, 2025 |
| Sep 3, 2025 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 8, 2025 |
| Mar 10, 2023 | C | Apt 8 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 5, 2023 |
| Oct 20, 2022 | C | Apt 8 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 60 SQ FT AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 8, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 15, 2022 |
| Jan 25, 2021 | C | Apt 9 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 20, 2021 |
| Jan 25, 2021 | C | Apt 9 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 9, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 20, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 9:28 PM ET. BBL 1007590001.