20 floors · 278 apartments · 510,547 sq ft · built 1958 · class D4 · owner of record: Cannon Point South Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 510,547 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $18,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 847 days | Filing window not open yet |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1371). Agency page | Dec 31, 2031 in 1890 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT THE PARKING GARAGE, SUB CELLAR LEVEL THREE ELECTRICAL JUNCTION BOXES MISSING COVERS AT CEILING ABOVE CAR PARKING SPOT AND AT REAR WALL NEXT TO #39086551J | Jan 11, 2024 IN VIOLATION | $0 |
| Apr 20, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. OBSERVED AT PARKING GARAGE STRUCTURE, HORIZONTAL CRACK AT THE BOTTOM OF THE FIRST-FLOOR CONCRETE BEAM, ADJACENT TO THE VEHICLE ACCESS RAMP. NOTED HAIRLINE #39086552L | Jan 11, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 18, 2024 | CONSTRUCTION BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION # 123123618 DUE TO APPLICANT WITHDRAWAL. AT THE TIME OF INSPECTION, WORK IS 100 PERCENT COMPLETED. STOP ALL WORK FOR JOB # ONLY AND MAKE SITE SAFE. #24-01961 | DOB VIOLATION - ACTIVE |
| Sep 21, 2023 | ELEVATOR ELEVATOR IS SHUT DOWN DUE TO FIRE AND WATER DAMAGE. #23-02655 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 24, 2024 | B | Apt 11K · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 11K, 11th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 29, 2024 |
| May 3, 2021 | B | Apt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ....THE NORTH WALL IN THE CLOSET IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''north'' | Jun 7, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)