6 floors · 42 apartments · 46,200 sq ft · built 1941 · class D4 · owner of record: 45 Plaza Owners Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 50 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-25 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 15, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#35667309L AS OF 1/15/26.., FILE A CERTIFICATE O #39174047K | Feb 22, 2027 DEFAULT | $1,280 |
| Jun 24, 2024 | Construction CLASS - 1 UNLAWFUL ACTS: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER AS STATED IN ECB# 35667309L ISSUED ON 11/01/2023 AND FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 FOR UNSAFE, UNSUITABLE ELEC #39117578Z | May 5, 2025 DEFAULT | $6,250 |
| Nov 1, 2023 | Construction CLASS - 2 FAILURE TO POST OR PROPERLY POST PERMIT FOR WORK AT PREMISE. NOTE: AT TIME OF INSPECTION AT ABOVE PREMISES OBSERVED ELECTRICAL ACTIVITY IN UNIT #6C WITH NO PERMIT POST IN ANY CONSPICUOUS PLACE. REMEDY: POST/PRO #35667310Z | Nov 4, 2024 IN VIOLATION | $150 |
| Nov 1, 2023 | Unknown CLASS - 1 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. NOTES: AT TIME OF INSPECTION AT ABOVE PREMISES OBSERVED CONSTRUCTION ACTIVITY IN UNIT 6C. ELECTRICAL #35667309L | Jul 28, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 20, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00080 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 20, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 3:51 AM ET. BBL 3010640021.