9 floors · 16 apartments · 37,400 sq ft · built 1896 · class D4 · owner of record: Lispenard Studio Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 37,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $9,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 478 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 792 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 26, 2026 | Construction CLASS - 2 UNABLE TO GAIN ACCESS. CERTIFICATE OF CORRECTION NOT SUBMITTED FOR CLASS 1 FAILURE TO MAINTAIN VIOLATION #39168305N ISSUED ON 11/25/2025 FOR THE DUST ACCUMULATION IN APT #1E, CELLAR & BASEMENT., FILE A CERTIFIC #39201925X | Nov 5, 2026 PENDING | $1,250 |
| Nov 25, 2025 | Construction CLASS - 1 ATOI OBSERVED ACTIVE CONSTRUCTION IN THE PROPERTY. GAINED ACCESS INSIDE APT 1E, NOTICED A GOOD AMOUNT OF DUST ACCUMULATED NOTICED IN THE APPLIANCES AND ALL OVER THE BASEMENT / CELLAR. GENERAL CONTRACTOR FAILURE #39168305N | Jan 29, 2026 ADMIT/IN-VIO | $0 |
| Nov 6, 2025 | Construction CLASS - 2 OBSERVED ON FIRST FLOOR APARTMENT 1E HOLES IN CEILING AND FLOORS. IN BASEMENT BOILER ROOM, HALLWAYS, AND ELEVATOR MACHINE ROOM, MULTIPLE HOLES IN WALLS AND CEILINGS WITH NO FIRE STOPPING. BOILER ROOM FAN NOT OP #39166221R | Jul 20, 2026 IN VIOLATION | $0 |
| Nov 6, 2025 | Construction CLASS - 2 OBSERVED IN THE BASEMENT IN THE ELEVATOR MACHINE ROOM GAS LINE INSTALLED WHICH CONTRARY TO NYC ELEVATOR CODE APPENDIX K SECTION 2.7.2.1, REPAIR AND/OR REPLACE #39166220P | Oct 30, 2026 DEFAULT | $6,250 |
| Mar 26, 2025 | Construction CLASS - 2 FAILURE TO POST/ PROPERLY POST ACTIVE PERMIT FOR ELECTRICAL WORK IN BUILDING. ATOI ACTIVE WORK PERMIT ON FILE WITH THE DEPARTMENT BUT IS NOT POSTED ANYWHERE ON PREMISES, M00817148-I1-EL EXP- 04/13/2025., POST/P #39142928Y | Jun 5, 2025 ADMIT/IN-VIO | $0 |
| Aug 28, 2024 | Boilers CLASS - 2 FOUND FEDERAL(MODEL#FST 60 ) OIL FIRED BOILER. LOUVER IN BOILER ROOM NOT PROVIDING SUFFICIENT AIR FOR PROPER COMBUSTION, ALSO PROVIDE COMBUSTION TEST.RESULTS CORRECT VIOLATING CONDITION SUBMIT CERTIFICATE OF CO #39123463J | Nov 7, 2024 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 20, 1991 | ELEVATOR #1426A4 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 29, 2024 | C | Apt 1E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT SOUTH WALL AT LOWER LEVEL IN THE 1st ROOM FROM EAST LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 24, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 26, 2026 | ECB | Construction: UNABLE TO GAIN ACCESS. CERTIFICATE OF CORRECTION NOT SUBMITTED FOR CLASS 1 FAILURE TO MAINTAIN VIOLATION #39168305N ISSUED ON 11/25/2025 FOR THE DUST ACCUMULATION IN APT #1E, CELLAR & BASEMENT., FILE A CERTIFIC | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 12:28 PM ET. BBL 1002100026.