Manhattan · Block 2170 · Lot 520 · 10040

45 Fairview Avenue

21 floors · 218 apartments · 283,388 sq ft · built 1963 · class D4 · owner of record: Inwood Gardens Inc

173open violations
$0ECB/OATH penalties owed
13HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-12-15 (Accepted). Agency page

Dec 31, 2026
in 67 days
2 of 2 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 283,388 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 432 days
Next cycle year 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $6,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 484 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2170). Agency page

Dec 31, 2030
in 1528 days
Next due 2030

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 25, 2025Construction CLASS - 2
1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS
#37033419K
Mar 19, 2026
IN VIOLATION
$0
Jan 11, 2011Boilers CLASS - 2
B254/50/50A/50B/50C/50D/50E/50F/34B/THREE BOILER WATER CONTROLS,PIPE TO BOILER ON THE SAME WATER CONNECTION.50A-STAY BOLT LEFT SIDES.50B-REAR RETAIN AND BLOWDOWN CONNECTORS CORRODED50C-OIL PUMP POELTGUARD MISSI
#32070108Y
Mar 3, 2011
DEFAULT
$0
DOB (2)
IssuedViolationStatus
Sep 28, 2023CONSTRUCTION
APPROX 30 LINEAR FEET OF 8'-0" TALL CHAIN LINK FENCE AT EXP #3 ELEVATION (HILLSIDE AVENUE) OF PROPERTY HAS BEEN RENDERED NON-COMPLIANT TO CODE DUE TO FALLING TREE(S). LOT IS NOW UNSECURED AND ACCESSIBLE FROM HILLSIDE AVE.
#23-02718
DOB VIOLATION - ACTIVE
Dec 15, 2022RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00021
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
Mar 6, 2026Energy Grade - LL33 FTP-EN-EGRDEA
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3
Active
Dec 15, 2022Retaining Walls FTF-RW-INITL
Active
HPD (165) · C 13 · B 118 · A 34
IssuedClassViolationCorrect by
Jul 13, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jul 13, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jul 13, 2026CApt 20E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 8, 2026
Jul 13, 2026BApt 20E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jul 13, 2026BApt 20E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR LEADING TO BALCONY IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jul 13, 2026CApt 20E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE KITCHEN LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHJul 19, 2026
Jul 13, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jul 13, 2026BApt 20E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHUB IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jul 13, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jul 13, 2026BApt 20E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR FRAME LEADING TO BALCONY IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 17, 2026
Jan 21, 2026CApt 20E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTJan 27, 2026
Jan 20, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CLOSET CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026BApt 20E · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026BApt 20E · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026CApt 20E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 15, 2026
Jan 20, 2026BApt 20E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH 1ST WINDOW FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026CApt 20E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS WINDOW IN DOOR LEADING TO TERRACE IN THE 2nd ROOM FROM NORTH LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTJan 26, 2026
Jan 20, 2026CApt 20E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 15, 2026
Jan 20, 2026BApt 20E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE ENTRANCE LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026AApt 20E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING OF THE CLOSET IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 25, 2026
Jan 20, 2026BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CLOSET CEILING IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026BApt 20E · § 27-2005 HMC: REFIT DOOR LEADING TO TERRACE IN THE 2nd ROOM FROM NORTH LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jul 7, 2025BApt T1C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT T1C, 3rd BSMT-APT FROM NORTH AT EASTAug 11, 2025
Jul 7, 2025BApt T1C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT BSMT-APT T1C, 3rd BSMT-APT FROM NORTH AT EASTAug 11, 2025
Jul 7, 2025BApt T1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT BSMT-APT T1C, 3rd BSMT-APT FROM NORTH AT EASTAug 11, 2025
Jul 7, 2025BApt T1C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT T1C, 3rd BSMT-APT FROM NORTH AT EASTAug 11, 2025
Jul 16, 2024BApt T1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT CELLAR APT T1C, 1st CELLAR APT FROM NORTH AT EASTAug 20, 2024
Jul 16, 2024BApt T1C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT CELLAR APT T1C, 1st CELLAR APT FROM NORTH AT EASTAug 20, 2024
Jul 11, 2024BApt T1C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BELL BUZER FROM BUILDING ENTRANCE TO NORTH WALL. IN THE PRIVATE HALLWAY LOCATED AT CELLAR APT T1C, 1st CELLAR APT FROM NORTH AT EASTAug 15, 2024
Jul 11, 2024BApt T1C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT CELLAR APT T1C, 1st CELLAR APT FROM NORTH AT EASTAug 15, 2024
Jul 11, 2024BApt T1C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT CELLAR APT T1C, 1st CELLAR APT FROM NORTH AT EASTAug 15, 2024
Jul 9, 2024C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT FIRE DOOR STAIRCASE B PUBLIC HALL BASEMENTJul 23, 2024
Jul 9, 2024BApt T1C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT T1C, 1st BSMT-APT FROM NORTH AT EASTAug 13, 2024
Jul 9, 2024BApt T1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT BSMT-APT T1C, 1st BSMT-APT FROM NORTH AT EASTAug 13, 2024
Jul 9, 2024BApt T1C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT T1C, 1st BSMT-APT FROM NORTH AT EASTAug 13, 2024
Jul 9, 2024BApt T1C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT BSMT-APT T1C, 1st BSMT-APT FROM NORTH AT EASTAug 13, 2024
Jul 9, 2024AApt T1C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT NORTH WALL IN THE FOYER LOCATED AT BSMT-APT T1C, 1st BSMT-APT FROM NORTH AT EASTOct 12, 2024
May 24, 2024BApt 20E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 9 SQ FTS AT CEILING IN THE BATHROOM LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16620283 ISSUED 24-JAN-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.Jun 28, 2024
Jan 25, 2024AApt 20E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL COMMERCIAL FLOOR TILES IN THE KITCHEN LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 29, 2024
Jan 25, 2024BApt 20E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL COMMERCIAL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 29, 2024
Jan 25, 2024BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 29, 2024
Jan 25, 2024BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 29, 2024
Jan 25, 2024AApt T1H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BELL BUZER FROM BUILDING ENTRANCE TO THE NORTH WALL IN THE FOYER LOCATED AT BSMT-APT T1H, 3rd BSMT-APT FROM EAST AT SOUTH , SECTION ''1ST LEVEL''Apr 29, 2024
Jan 25, 2024BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 29, 2024
Jan 25, 2024AApt 20E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 29, 2024
Jan 25, 2024BApt 20E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 29, 2024
Jan 25, 2024BApt 20E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ON SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 29, 2024
Jan 25, 2024BApt 13G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH ,WEST AND NORTH WALLS IN THE BATHROOM LOCATED AT APT 13G, 13th STORY, 4th APARTMENT FROM EAST AT SOUTHFeb 29, 2024
Jan 25, 2024AApt 20E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH COUNTER BALANCE AT SOUTH WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 29, 2024
Jan 25, 2024AApt 20E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH AND WEST WALL IN THE BATHROOM LOCATED AT APT 20E, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 29, 2024
Sep 11, 2023BApt 20E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 16, 2023
Sep 11, 2023AApt 20E · § 27-2005 HMC: REFIT THE DOOR IN THE TERRACE LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 15, 2023
Sep 11, 2023BApt 20E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 16, 2023
Sep 11, 2023BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT CLOSET IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 16, 2023
Sep 11, 2023BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 16, 2023
Sep 11, 2023BApt 20E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 16, 2023
Sep 7, 2023BApt 20E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 12, 2023
Sep 7, 2023BApt 20E · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 12, 2023

Showing 60 of 165. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open
Jul 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR LEADING TO BALCONY IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE KITCHEN LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD B§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHUB IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE BATHROOM LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Jul 13, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR FRAME LEADING TO BALCONY IN THE 2nd ROOM FROM EAST LOCATED AT APT 20E, 19th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 7:33 AM ET. BBL 1021700520.

Look up another building