Queens · Block 83 · Lot 18 · 11101

45-40 Court Square

4 floors · 193,400 sq ft · built 1989 · class G1 · owner of record: Nyc Department Of Transportation

20open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
184dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 193,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1159 days
Next cycle year 2029
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 83). Agency page

Dec 31, 2033
in 2620 days
Next due 2033

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 11, 2026Unknown CLASS - 2
FAILURE TO MAINTAIN PARKING STRUCTURES IN SAFE CONDITION.AS NOTED:AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURES CONSISTING OF 4 LEVELS & ROOF OBSERVED CRACKED MASONRY WALL AND BRICK WALL AT EXPOSURE 1
#35726785J
Mar 10, 2026
POP/IN-VIO
$0
Sep 3, 2024Construction CLASS - 1
28-323.8 RCNY 103-13(5)FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE THEBUILDING'S STRUCTURE AND APPURTENANCES CONFORM TO THE PROVISIONS OF THE ADMIN CODE AFTER UNSAFE NOTIFICATION FILED BY QPSI#UNPS-Q0000592-1C-
#35686436H
Nov 12, 2024
POP/IN-VIO
$0
DOB (4)
IssuedViolationStatus
Nov 16, 2017ELEVATOR

#2742C01
DOB VIOLATION - ACTIVE
Mar 2, 2017ELEVATOR

#9028/597509
DOB VIOLATION - ACTIVE
Jan 5, 2016ELEVATOR

#9027/560671
DOB VIOLATION - ACTIVE
Jan 5, 2016ELEVATOR

#9027/560672
DOB VIOLATION - ACTIVE
DOB NOW Safety (14)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 8:22 AM ET. BBL 4000830018.

Look up another building