2 floors · 9,495 sq ft · built 1960 · class M1 · owner of record: Flushing First Chruch Of
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 22, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33. NOTES: AT TIME OF INSPECTION AN ALTERATION 1 INSTALL NEW ELEVATOR WORKIN PROGRESS,I OBSERVED TEMPORARY PLATFORM INSIDE OF ELEVATOR SHAFT. #35505224K | Jan 18, 2022 IN VIOLATION | $0 |
| Oct 11, 2018 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER-WORK WITHOUT A PERMIT.SIDEWALK CURB AT NORTH SIDE OF 149 ST HAS BEEN CUT AND LOWERED WITHOUT FIRST OBTAIN THE REQUIRED PERMIT.OBSERVED CURB CUT IS 18'LONG #35349963M | Dec 18, 2018 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 10, 2026 | CONSTRUCTION BC NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO APPLICANT WITHDRAW FROM THE PROJECT # 400459703. PLEASE KINDLY CONTACT THE BOROUGH COMMISSIONER ON (718-286- 7670) AS SOON AS POSSIBLE. STOP ALL WORK MAKE SITE SAFE. #26-01764 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOCAL LAW 62/91 - BOILERS THIS VIOLATION WAS FOR A 1992 VIOLATION THAT ACCIDENTALLY DISMISSED #13621 | DOB VIOLATION - ACTIVE |
| Jun 7, 1994 | LOCAL LAW 62/91 - BOILERS #04853 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 13, 2011 | Boiler LL6291 THIS VIOLATION WAS FOR A 1992 VIOLATION THAT ACCIDENTALLY DISMISSED | Active |
| Jun 7, 1994 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 10, 2026 | DOB | CONSTRUCTION: BC NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO APPLICANT WITHDRAW FROM THE PROJECT # 400459703. PLEASE KINDLY CONTACT THE BOROUGH COMMISSIONER ON (718-286- 7670) AS SOON AS POSSIBLE. STOP ALL WORK MAKE SITE SAFE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 10:30 AM ET. BBL 4054320067.