| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2026 | Unknown CLASS - 2 UPON INSPECTION I OBSERVED INADEQUATE AND UNSAFE DOT BARRIERS INSTALLED AT EXPOS 2. I OBSERVED A GENERATOR STORED INSIDE BARRIERS IN STREET THAT WAS NOT FULLY ENCLOSED WITH FENCE AND WIDESCREEN (AS PER DOT REGU #39559670J | Dec 2, 2026 PENDING | $2,500 |
| Sep 25, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A FENCE AND SIDEWALK SHED INSTALLED AT EXPOS 1 WITH NOT FENCE AND SIDEWALK SHED INFO PANELS INSTALLED CONTRARY TO CODES 3301.9.1.2 POSTING OF PROJECT INFORMATION PANELS & 3301.9.2.2 P #39559671L | Dec 2, 2026 PENDING | $1,250 |
| Sep 25, 2026 | Unknown CLASS - 1 UPON INSPECTION I OBSERVED PIPE SCAFFOLD (APPROX. 60FT TALL) AND A SIDEWALK SHED INSTALLED AT EXPOS 1 IN USE. PIPE SCAFFOLD WAS INSTALLED WITHIN 10FT OF EXPOSED AND UNPROTECTED (UNINSULATED) POWERLINES AT EXPOS #39559665P | Dec 2, 2026 PENDING | $5,000 |
| Sep 25, 2026 | Construction CLASS - 1 UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED PIPE SCAFFOLD (IN USE) AND SIDEWALK SHED INSTALLED WITHIN 10FT OF UNPROTECTED POWERLINES. UPON REVIEW OF THE SITE SAFETY LOGISTICS PLANE I OBSERVED MAJOR DETAI #39559666R | Dec 2, 2026 PENDING | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | ECB | Unknown: UPON INSPECTION I OBSERVED INADEQUATE AND UNSAFE DOT BARRIERS INSTALLED AT EXPOS 2. I OBSERVED A GENERATOR STORED INSIDE BARRIERS IN STREET THAT WAS NOT FULLY ENCLOSED WITH FENCE AND WIDESCREEN (AS PER DOT REGU | Open |
| Sep 25, 2026 | ECB | Construction: UPON INSPECTION I OBSERVED A FENCE AND SIDEWALK SHED INSTALLED AT EXPOS 1 WITH NOT FENCE AND SIDEWALK SHED INFO PANELS INSTALLED CONTRARY TO CODES 3301.9.1.2 POSTING OF PROJECT INFORMATION PANELS & 3301.9.2.2 P | Open |
| Sep 25, 2026 | ECB | Unknown: UPON INSPECTION I OBSERVED PIPE SCAFFOLD (APPROX. 60FT TALL) AND A SIDEWALK SHED INSTALLED AT EXPOS 1 IN USE. PIPE SCAFFOLD WAS INSTALLED WITHIN 10FT OF EXPOSED AND UNPROTECTED (UNINSULATED) POWERLINES AT EXPOS | Open |
| Sep 25, 2026 | ECB | Construction: UPON INSPECTION OF AN ACTIVE 4 STORY NB I OBSERVED PIPE SCAFFOLD (IN USE) AND SIDEWALK SHED INSTALLED WITHIN 10FT OF UNPROTECTED POWERLINES. UPON REVIEW OF THE SITE SAFETY LOGISTICS PLANE I OBSERVED MAJOR DETAI | Open |