2 floors · 1 apartments · 1,870 sq ft · built 1940 · class A5 · owner of record: Nyang, Mbaheh
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 15, 2025 | C | Apt 1FL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT THE CEILING IN THE 2nd BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 18037233 ISSUED 17-JUN-25 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRA | Nov 10, 2025 |
| Jul 2, 2025 | C | Apt 1FL · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jul 26, 2025 |
| Jul 1, 2025 | C | Apt 1FL · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 1FL, 1st STORY, 1st APART | Jul 25, 2025 |
| Jul 1, 2025 | B | Apt 1FL · § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT BATH TUB IN THE 2nd BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 5, 2025 |
| Jun 27, 2025 | B | Apt 1FL · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd BATHROOM LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 1, 2025 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:26 AM ET. BBL 2050670028.