4 floors · 5,880 sq ft · built 1931 · class K9 · owner of record: 445 Gk Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 12, 2025 | CONSTRUCTION REAR 1ST FL EXT DAMAGD BY FIRE DURING INT RENO (PERMITX01225858-I1-GC) ENG RPTS 11/24/25 & 12/08/25 BY MD ISLAM, PE RECOMMENDS TEMP STABILIZATION UNDER PERMIT. REMEDY: RETAIN NYS PE & GC TO TEMP STABZ BLDG., SAFEGUARD SITE & ADJ PROPS. FILE CONSTRU DOCS & SUBMIT FOR REVIEW BY 12/19/25 #CE20601YU | DOB VIOLATION - ACTIVE |
| Dec 12, 2025 | CONSTRUCTION REAR 1ST FL EXT DAMAGED BY FIRE DURING INT RENO PERMIT X01225858-I1-GC ENG RPTS 11/24/25 & 12/08/25 BY MD ISLAM, PE RECOMMENDS WEEKLY STRUCT STABLTY INSPECTIONS, CONTROL # 376457. REMEDY: RETAIN NYS PE 4 WEEKLY STAB INSPNS.SUBMIT SGND RPTS W/PHOTOS HAZARD ID,.RESOLUTION PATH & GLOBAL/LOCAL STAB ASSE #CE20602YU | DOB VIOLATION - ACTIVE |
| Nov 9, 2025 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. OBSERVED REAR SET BACK AT 1FL SUSTAINED DAMAGED DUE TO A FIRE AT 1FL REAR SETBACK. BUILDING IS UNDER CONSTRUCTION TO PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 4 STORY& CELLAR INTO 17 RESIDENTIAL UNIT UNDER ACTIVE PERMIT #X01225858-I1-GC. #25-02524 | DOB VIOLATION - ACTIVE |
| Nov 9, 2025 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED 4 STORY NFP REAR SET BACK AT 1FL SUSTAINED DAMAGES DUE TO A FIRE. OBSERVED BROKEN DAMAGED CEILINGS, CHARRED JOISTS, WATER DAMAGE AND OPEN ROOF. #25-02523 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02131 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 22, 2026 | Structurally Compromised Buildings FTF-SC-INITL Report due for structurally compromised property | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 11:22 AM ET. BBL 2030340056.