7 floors · 57 apartments · 44,619 sq ft · built 2020 · class D7 · owner of record: 444 Graham Ave., Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 102 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 44,619 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 16, 2023 | Construction CLASS - 2 OBSERVED ON FLOORS FROM CELLAR TO THE SEVEN FLOOR INSTALLED A SPRINKLER SYSTEM. NINETY PERCENT OF THE WORK COMPLETED NO PERMITS, OBTAIN ALL PERMITS #39092739M | Jul 14, 2025 IN VIOLATION | $1,250 |
| Mar 29, 2023 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT.AS NOTED:AT TIME OF INSPECTION ON ACTIVE CONSTRUCTION SITE OBSERVED AT EXP #1 #4 IN PLACE SIDEWALK SHED & SWS PERMIT EXPIRED 1/5/23 PERMIT B00501325-L1-SH #35670743L | Feb 5, 2024 IN VIOLATION | $1,250 |
| Jan 31, 2023 | Construction CLASS - 1 A WORKER WAS IN AN AREA THAT HAD A CAZ SIGN HIGH UP, BUT WAS NOT BARRICADED OFF TO PREVENT ACCESS. THE WORKER WAS NOT INSTRUCTED TO REMOVE MATERIAL PRIOR TO WORKING NEAR THE WINDOW, SO HE WOULDN'T HAVE TO LEAN #39512405K | Sep 21, 2026 IN VIOLATION | $2,500 |
| Jan 31, 2023 | Construction CLASS - 1 AN ACTIVE JOBSITE WITH SUPPORTED SCAFFOLD MATERIAL STORED IN FRONT OF A WINDOW, WERE A WORKER PLACED A LADDER TO CAULK THE WINDOW. THE AREA WAS NOT CLEARED OR FREE FROM MATERIAL TO ALLOW THE WORK TO WORK SAFELY #39512404Z | Sep 21, 2026 IN VIOLATION | $2,500 |
| Jul 17, 2022 | Construction CLASS - 1 WORK WITHOUT PERMIT. AT TIME OF INSPECTION SUPPORTED SCAFFOLD INSTALLED AT EXPOSURE #1 WITH NO PERMITS ON FILE., OBTAIN PERMIT #39066070K | Nov 16, 2022 IN VIOLATION | $1,250 |
| Apr 24, 2018 | Construction CLASS - 1 FAILURE TO PROMPTLY NOTIFY THE DEPT OF AN ACCIDENT OR DAMAGE TO ADJOINING PROPERTY AT CONSTRUCTION/DEMOLITION SITE.AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK I #35313733M | Sep 10, 2018 IN VIOLATION | $5,000 |
| Apr 24, 2018 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION SUPPORT OF EXCAVATION WORK INSTALLED #35313741M | Sep 10, 2018 IN VIOLATION | $1,250 |
| Apr 24, 2018 | Construction CLASS - 1 BC3309.6/FAILURE TO MONITOR ADJOINING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION RELATED ACTIVITY THAT MAY ADVERSELY AFFECTADJOINING STRUCTURES(NO CRACK GAUGES INSTALLED)AT THE TIME OF INSPECTI #35313735X | Sep 10, 2018 IN VIOLATION | $1,250 |
| Apr 24, 2018 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK WHERE IT WAS NOTED THAT SOE-102. #35313734Y | Sep 10, 2018 IN VIOLATION | $485 |
| Apr 24, 2018 | Construction CLASS - 1 FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATIONS.AT THE TIME OF INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK IN PROGRESS WHERE IT WAS NOTED THAT RETAINING WALL #35313738L | Sep 10, 2018 IN VIOLATION | $5,000 |
| Apr 24, 2018 | Construction CLASS - 1 BC1704.1.1/FAILURE TO FILE A SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO PERMIT ISSUANCE AND PRIOR TO START OF WORK UNDER SPECIAL INSPECTION REQUIREMENT.AT THE TIME OF MY INSPECTION IT WAS OBSERVED #35313739N | Sep 10, 2018 IN VIOLATION | $1,250 |
| Apr 24, 2018 | Construction CLASS - 1 FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES DURING CONSTRUCTION OR DEMOLITION OPERATION.AT THE TIME OF MY INSPECTION IT WAS OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK WHERE IT W #35313742Y | Sep 10, 2018 IN VIOLATION | $1,250 |
| Apr 24, 2018 | Construction CLASS - 1 BC3304.8 EXCAVATION NOT ADEQUATELY DRAINED OF RAIN WATER AND OR SUB SURFACE WATER.AT THE TIME OF MY INSPCTION IT WAS OBSERVE AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK WHERE REWATERING OPERATIONS WHERE IL #35313744H | Sep 10, 2018 IN VIOLATION | $500 |
| Apr 24, 2018 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.AT THE TIME OF INSPECTION IT WAS OBSERVE AN ACTIVE CONSTRUCTION SIT WITH EXCAVATION WORK WHERE IT WAS NOTED THAT RETAINING WALL A #35313740K | Sep 10, 2018 IN VIOLATION | $25,000 |
| Issued | Violation | Status |
|---|---|---|
| Jul 13, 2009 | CONSTRUCTION INADEQUATE DETAILS APPROVED PLANS FOR SEQUENCE OF PARTIAL DEMOLITION O F INTERIOR MASONRY, STRUCTURAL STEEL, OF LOCATION STEEL COLUMS REMOVED IN NEW TOWER AREA, SHORING REQUIRED AND SEQUENCE OF COLUMN REMOVAL/NE W COLUMN INSTALLATION, EQUIPMENT USE, INCLUDED LIMITATIONS AND SAFEGUA REMEDY: STOP ALL #EX01ADS | DOB VIOLATION - ACTIVE |
| Jul 13, 2009 | CONSTRUCTION FAILURE TO MAINTAIN MASONRY WALL AT EXPOSURE 4 (RIGHT OF GRAHAM AVE. E NTRANCE) AT INTERIOR APPROX. 70-80 FT. FROM STOREFRONT. APPROX. 1/2" VERTICAL CRACK RUNNING FLOOR TO CEILING. NOTED DEMO WORK IN PROGRESS UNDER NB PERMIT #310081639 REMEDY: MAINTAIN STRUCTURE. PROVIDE PE REPORT OF STRUCTURAL INTE #EX03ADS | DOB VIOLATION - ACTIVE |
| Jun 11, 2009 | CONSTRUCTION INADEQUATE DETAILS ON APPROVED PLANS FOR FOUNDATION AND STRUCTURAL STE EL WORK. NO DEMO/REBUILD SEQUENCING OF EXISTING STRUCTURE, OR SUPPORT OF EXISTING STRUCTURE DESIGN REMEDY: STOP ALL WORK FORTHWITH. ALL PLANS TO SEP EX FOR ENGINEERING REVIEW. SEP EX 212-442-1698 #EX01ADJ | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 8:13 PM ET. BBL 3027350004.