1 floors · 176,400 sq ft · built 1997 · class F2 · owner of record: Pratt Paper Ny, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 176,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 163 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 163 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1138 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2705). Agency page | Dec 31, 2035 in 3329 days | Next due 2035 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-07 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2017 | Elevators CLASS - 2 02X10)EMERGENCY PHONE INOPERATIVE. #38258202N | Nov 15, 2017 IN VIOLATION | $0 |
| Jun 20, 2017 | Unknown CLASS - 2 FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001423 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER 1, 2016. REM: FILE ANNUAL #37003282L | Dec 20, 2017 ADMIT/IN-VIO | $0 |
| Aug 19, 2010 | Boilers CLASS - 2 B254/36 #32069501M | Oct 6, 2010 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 7, 2026 | CONSTRUCTION REQUESTING AN ENGINEER REPORT DUE TO A FIRE IN A 2-STORY FP COMMERCIAL BUILDING. FIRE HAS DAMAGED STEEL COLUMNS CAUSING STRUCTURAL DISTRESS. STEEL COLUMNS STABILITY HAS BEEN COMPROMISED. AN ENGINEER REPORT IS REQUIRED TO ASSESS ALL COLUMNS. #26-01252 | DOB VIOLATION - ACTIVE |
| May 7, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. RESPONDING TO AN INCIDENT OBSERVED 2-STORY FP PAPER FACTORY BUILDING THAT HAD SUSTAINED FIRE DAMAGES. OBSERVED CHARRED AND BROKEN METAL CORRUGATED SHEETS AND WATER DAMAGE THROUGHOUT. #26-01251 | DOB VIOLATION - ACTIVE |
| Dec 1, 2022 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2202008 | DOB VIOLATION - ACTIVE |
| Aug 3, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00148 | DOB VIOLATION - ACTIVE |
| Jun 2, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00466 | DOB VIOLATION - ACTIVE |
| Feb 3, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00132 | DOB VIOLATION - ACTIVE |
| Nov 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01086 | DOB VIOLATION - ACTIVE |
| Aug 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01843 | DOB VIOLATION - ACTIVE |
| May 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01843 | DOB VIOLATION - ACTIVE |
| May 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01139 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION #00288 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION #00287 | DOB VIOLATION - ACTIVE |
| Aug 8, 2013 | ELEVATOR #9027/478512 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2022 Internal Inspection Affirmation of Correction for HP Device | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Dec 1, 2022 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Aug 3, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 2, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 3, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 15, 2014 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| May 15, 2014 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 10:26 AM ET. BBL 5027050225.