4 floors · 192,800 sq ft · built 1992 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 192,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1148). Agency page | Dec 31, 2028 in 798 days | Next due 2028 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-31 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 18, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THETIME OF INSPECTION,2 EMERGENCY LIGHTS IN CAFETERIA WERE NOT WORKING.RE #35727133Z | Apr 13, 2026 POP/IN-VIO | $0 |
| Mar 18, 2026 | Construction CLASS - 2 REISSUED 35688769P AT THE TIME OF INSPECTION,THE FOLLOWING EXIT DISCHARGE DOORS WERE NOT SELF-CLOSING PROPERLY-#6,#7,#8.REM:REPAIR/REPLACE DOOR. #35727130N | Apr 13, 2026 POP/IN-VIO | $0 |
| Mar 18, 2026 | Construction CLASS - 2 REISSUED 35688770M AT THE TIME OF INSPECTION,THERE WAS AN OPENING IN THE GYM CEILING AS A RESULT OF WATER INFILRATION.EXIT DISCHARGE DOORS FROM GYM HAD HOLES AS A RESULT OF COROSION.LEAKING PIPE IN GAS METER RO #35727129X | Apr 13, 2026 POP/IN-VIO | $0 |
| Mar 18, 2026 | Construction CLASS - 2 28-301.1 UNLAWFUL DISPLAY OF ARTWORK IN CORRIDORS GREATER THAN 20% PERFDNY 2008 CODE;FC 803.3.2.AT THE TIME OF INSPECTION,3RD FLOOR CORRIDORHAD MORE THAN 20% ARTWORK.PAPER CUBES WERE HANGING FROM CORRIDOR ON 3R #35727132R | Apr 13, 2026 POP/IN-VIO | $0 |
| Mar 18, 2026 | Construction CLASS - 2 REISSUED 35678659P AT THE TIME OF INSPECTION,THE FOLLOWING ROOM DOORS WERE NOT SELF-CLOSING PROPERLY-421,414,408,319,322,214,222,218,108,128VESTIBULE DOOR TO EXIT#7 DISCHARGE DOOR WAS NOT SELF-CLOSING PROPERLY. #35727131P | Apr 13, 2026 POP/IN-VIO | $0 |
| Mar 28, 2025 | Construction CLASS - 2 REISSUE#35678659P NOTED EXIT 2 BOTH DOORS.EXIT 6 BOTH DOORS.EXIT 7 ONEDOOR AND EXIT 10 BOTH DOORS.ALL THESE DOORS WERE NOT CLOSING PROPERLY REM:REPAIR/REPLACE DOOR. #35688769P | Jul 9, 2025 POP/IN-VIO | $0 |
| Mar 28, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:OBSERVED IN THE GYMNASIUM THERE IS A HOLE IN THE CEILING DUE TO WATER DAMAGE.REMREPAIR AND/OR REPLACE. #35688770M | Jul 9, 2025 POP/IN-VIO | $0 |
| Mar 1, 2024 | Construction CLASS - 2 REISSUE#356654096X EXIT DOOR NOT SELF-CLOSING NOTED:AT TIME OF INSPECTION I OBSERVED WITH MAIN ENTRANCE EXIT DOOR TO DWELLING IS NOT OPEN PROPERLY ALSO ON 2ND FLOOR AT STAIRCASE BY 218,1ST FLOOR CORRIDOR DOOR B #35678659P | May 2, 2024 POP/IN-VIO | $0 |
| Jun 6, 2023 | Boilers CLASS - 3 INCORRECT INSTALLATION OF BACKFLOW IN WATER PIPE OF DOMESTIC HW BOILER/RE CIRCULATING PIPE DISCONNECTED/INCORRECT EXPANSION TANK INSTALLED IN DOM HW LINE/TOP PRESSURE RELIEF VALVE NOT PIPED DOWN/TOP RELIEF VALV #39087845J | Jun 30, 2023 POP/IN-VIO | $0 |
| Jun 6, 2023 | Boilers CLASS - 2 MOTORIZED AIR LOUVER #2 DEFECTIVE/OIL SUPPLY LINE AT TANK MISSING SHUTOFF VALVE/ANTI SYPHON VALVE INSTALLED INCORRECT LOCATION/WASTE PIPE LEAKING IN OIL TANK ROOM;CORRECT VIOLATION AND SUBMIT THE CERTIFICATE OF #39087843X | Jun 15, 2023 POP/IN-VIO | $0 |
| Jun 6, 2023 | Boilers CLASS - 1 CEASE USE DOMESTIC HW BOILER=SPILLING CO/FLUE PUSHED TOO FAR INTO CHIMNEY/FLUE CORRODED/DRAFTSTAT MISSING/SPILL SWITCH MISSING;CORRECT ALL HAZARDOUS CONDITIONS IMMEDIATELY AND CALL DOB TO LIFT CEASE USE ORDER A #39087842Y | Jun 15, 2023 POP/IN-VIO | $0 |
| Jan 10, 2023 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING NOTED:AT 2ND FLOOR STAIR D BY 218,1ST FLOORCORRIDOR DOORS BY EXIT 6 AND THE MAIN ENTRANCE TO THE BUILDING.THE EXIT DOORS ARE NOT WORKING PROPERLY.REM:REPAIR.REPLACE DOOR. #35655495X | Mar 22, 2023 POP/IN-VIO | $0 |
| Dec 19, 1991 | Construction Non-Hazardous FAILURE TO OBTAIN A PERMIT- A CHAIN LINK FENCK HAS BEEN ERECTED IN FRONT OF 423 ST MARKS AVENUE FOR APPROX 30'. NO PERMIT FOR SAID FENCK THE ABOVE RESPONDENT HAS ERECTED FENCK. REMEDY: OBTAIN A BLD DIEP. PERM #34063531Z | Feb 3, 1992 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #08974 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #08973 | DOB VIOLATION - ACTIVE |
| Jan 11, 2020 | ELEVATOR #9028/666531 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #06176 | DOB VIOLATION - ACTIVE |
| Jan 11, 2019 | ELEVATOR #9028/644197 | DOB VIOLATION - ACTIVE |
| Oct 8, 2010 | ELEVATOR ANNUAL INSPECTION / TEST #03446 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
None open.