1 floors · 3,120 sq ft · built 1989 · class K1 · owner of record: 2203 3rd Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1140 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 14, 2015 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS FOR ALT2 JOB#520141490 FOR WHICH PERMIT EXPIRED 6/6/14.NON CONFORMING WORK OBSERVED @ 1ST FL "BARLOS" ITALIAN RESTAURANT.NOTED TH #35111037N | Jun 3, 2015 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 15, 2023 | STRUCTURALLY COMPROMISED BUILDING FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. #00052 | DOB VIOLATION - ACTIVE |
| Jun 13, 2023 | CONSTRUCTION EMERGENCY WORK.BLDG SFFRD A 2-ALARM FIRE ON 6/9/23 &SUSTAIND STRCTRL DMGE.APPRX 18FT X 32FT D AREA OF SAGGNG FIRE DMGED ROOF JOISTS@CENTER BAY IN FRNT 2/3 OF BLDG.MSNRY ROOF FIRE DMGD@FRONT.IMMED INSTALL TGHTBRD FENCE TO ENCLSE PRKNG AREA&WALKWAY ON ENTIRE FRNTAGE@FRNT&4 PRKNG SPACES ADJCNT TO UNSTB #FEU50201BS | DOB VIOLATION - ACTIVE |
| Jun 13, 2023 | CONSTRUCTION EMERGENCY WORK.BLDG SFFRD A 2-ALARM FIRE ON 6/9/23&SUSTAINED STRCTRL DMGE.APPRX 18FTW X 32FTD AREA OF SAGGNG FIRE DMGD ROOF JOISTS@CENTER BAY IN FRNT 2/3 OF BLDG.W/OPEN HOLES IN ROOF&HVAC UNIT LEANING.1.IMMED INSTALL TEMP SHORNG TO STBILIZE FIRE DMGD ROOF,2.ALL WRK TO BE DRCTD& SPRVSD DRCTLY BY ONSI #FEU50202BS | DOB VIOLATION - ACTIVE |
| Jun 13, 2023 | CONSTRUCTION FTM.BLDG SFFRD A 2-ALARM FIRE ON 6/9/23&SUSTAIND STRUCTURAL DMGE.APPRX 18FT X 32FT D AREA OF SAGGNG FIRE DMGD ROOF JOISTS@CENTERBAY IN FRNT 2/3 OF BLDG.MULT OPEN HOLES IN ROOF&HVAC UNIT LEANING INTO.1.NYS PE STRCTRL ENGNEER TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 8/14/23,3.OBTN PRMTS #FEU50203BS | DOB VIOLATION - ACTIVE |
| Jun 9, 2023 | CONSTRUCTION AT TIME OF INSPECTION OBSERVED EXCESSIVE FIRE AND WATER DAMAGE, ROOF OPEN TO THE ELEMENTS, ROOF SAGGING WALLS AND CEILING DAMAGED DUE TO FIRE. #23-01822 | DOB VIOLATION - ACTIVE |
| Jun 9, 2023 | CONSTRUCTION DUE TO FIRE #ER01MP | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 15, 2023 | Structurally Compromised Buildings FTF-SC-INITL | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 1:26 PM ET. BBL 5024020020.