Brooklyn · Block 742 · Lot 7 · 11220

4407 8 Avenue

3 floors · 2 apartments · 3,000 sq ft · built 1923 · class S2 · owner of record: Abuzahrieh Husam

20open violations
$0ECB/OATH penalties owed
3HPD class C (immediately hazardous)
66dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-05-15 (Accepted). Agency page

Dec 31, 2026
in 66 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 310 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 431 days
Next cycle year 2027

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Jul 10, 2023Boilers CLASS - 2
FOUND CROWN GAS FIRED BOILER MODEL-AWR070ENS UNREGISTERED AND OPERATING., MAINTAIN BOILER; ;CORRECT ALL VIOLATING CONDITIONS REGISTER BOILER AND SUBMIT A CERTIFICATE OF CORRECTION.
#39089966P
Sep 13, 2023
DEFAULT
$0
Jul 10, 2023Boilers CLASS - 2
FOUND WILLIAMSON GAS FIRED BOILER MODEL-GWA-105 UNREGISTERED AND OPERATING., MAINTAIN BOILER; CORRECT ALL VIOLATING CONDITIONS REGISTER BOILER AND SUBMIT A CERTIFICATE OF CORRECTION.
#39089965N
Sep 13, 2023
DEFAULT
$0
Jul 10, 2023Boilers CLASS - 2
FOUND WEIL MCLAIN GAS FIRED BOILER MODEL-CG-3-SPDN ACTIVE AND OPERATING WITH DEFECTS. EXHAUSTING SMOKE FROM ADJACENT ROOM INTO BOILER CHIMNEY BASE CLEANOUT IS PROHIBITED. CORRECT ALL VIOLATING CONDITIONS AND SU
#39089964L
Sep 13, 2023
DEFAULT
$0
DOB (6)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#08511
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#07622
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#10306
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#30751
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#14779
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#11594
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
HPD (5) · C 3 · B 1 · A 1
IssuedClassViolationCorrect by
Jul 1, 2008BSECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN KITCHEN 3RD STORY APT.Aug 5, 2008
Jul 1, 2008CSECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING OF FRONT SOUTH ROOM 3RD STY APT 2.Jul 7, 2008
Jul 1, 2008CSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD UPPER SASH REAR SOUTH ROOM 3RD STY APT 2.Jul 7, 2008
Jul 1, 2008CSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS INSERT UPPER SASH FRONT SOUTH ROOM 3RD STY APT 2.Jul 7, 2008
Jul 1, 2008ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS & WALLS OF ALL ROOMS 3RD STY APT 2.Oct 4, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 8:11 AM ET. BBL 3007420007.

Look up another building