2 floors · 2 apartments · 2,920 sq ft · built 1933 · class S2 · owner of record: J & J Realty Partners
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 313 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 434 days | Next cycle year 2027 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 21, 2018 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF UNOPENABLE SCUTTLE COVER AT ROOF AT PUBLIC HALL STAIRS | Mar 1, 2018 |
| Feb 20, 2018 | A | § 27-2023 ADMIN. CODE: PROVIDE SUFFICIENT,PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL., 2nd STORY | May 26, 2018 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOWS THROUGHOUT APT, 2ND STORY REAR NORTH APT 2R. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILING REAR EAST ROOM, 2ND STORY REAR NORTH APT 2R. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR BELL FROM STREET TO 2ND STORY REAR NORTH APT 2R. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING LIGHT FIXTURE CEILING REAR EAST ROOM, 2ND STORY REAR NORTH APT 2R. | Sep 8, 2009 |
| Aug 4, 2009 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILINGS THROUGHOUT APT, 2ND STORY REAR NORTH APT 2R. | Nov 7, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED WIRE CEILING REAR EAST ROOM, 2ND STORY REAR NORTH APT 2R. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILING, 1ST STORY PUBLIC HALL. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING, 1ST STORY PUBLIC HALL. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT SWITCH WALL REAR WEST ROOM, 2ND STORY REAR NORTH APT 2R. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR HALLWAY, 2ND STORY REAR NORTH APT 2R. | Sep 8, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 3:53 PM ET. BBL 3049610051.