| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 11, 2021 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER. ON 1/15/21 A FULL STOP WAS ISSUED BY BADGE 3085 REQUESTING TO STOP ALL WORK ONENTIRE SITE DUE TO EXPIRED REGISTRATION. THE SWO POSTED STATED TO PROV #35450098N | Apr 29, 2021 DEFAULT | $12,500 |
| Jan 15, 2021 | Construction CLASS - 1 28-418.1 EXPIRED GENERAL CONTRACTOR REGISTRATION. AT TIME OF INSPECTION AT AN ACTIVE CONSTRUCTION JOBSITE. UPON REVIEW ON BIS, I OBSERVED THE GC REGISTRATION EXPIRED 10/17/2020. REMEDY: RENEW REGISTRATION #35545716N | Apr 1, 2021 DEFAULT | $6,250 |
| Jun 29, 2020 | Construction CLASS - 2 FAILURE TO PROVIDE APPROVE/ACCEPTED PLANS DESIGN DRAWING AT JOBSITE ATTIME OF INSPECTION.NOTE: AT TIME OF INSPECTION OF 6 STORY BLDG W/CONSTRUCTION WORK IN PROGRESS I OBSERVED SIDEWALK SHED IN PLACE UPON REQUES #35492639M | Feb 4, 2021 IN VIOLATION | $325 |
| Nov 20, 2018 | Construction CLASS - 1 FAILURE TO NOTIFY D.O.B. WITHIN 24-48 HOURS OF THE START OF EXCAVATION. AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONSTRUCTION SITE WAS IN THE EXCAVATION/FOUNDATION PHASE, HOWEVER THE D.O.B. WAS NOT N #35368266K | May 23, 2019 IN VIOLATION | $2,500 |
| Nov 20, 2018 | Construction CLASS - 2 3307.3.2 FAILURE TO PROVIDE LOT-LINE CONSTRUCTION FENCE. AT THE TIME OF INSPECTION,IT WAS OBSERVED THAT A GREEN MESH NETTING ATTACHED TO VERTICAL 2X4'S,WERE INSTALLED AT EXPOSURE#4,INSTEAD OF A SOLID PLYWOOD 8F #35368267M | May 23, 2019 IN VIOLATION | $400 |
| Nov 20, 2018 | Site Safety CLASS - 1 FAILURE TO MAINTAIN/DISPLAY ON-SITE DOCUMENTS REQUIRED BY:BC CHAPTER 33(NO SITE SAFETY PLAN) AT THE TIME OF INSPECTION, IT WAS OBSERVED THATTHE SITE SAFETY PLAN WAS NOT ONSITE TO VERIFY THE ONGOING WORK TAKING #35368265Z | May 23, 2019 IN VIOLATION | $1,250 |
| Aug 21, 2018 | Construction CLASS - 2 SEC. 3307.7.3 NO VIEWING PANELS. AT THE TIME OF MY INSPECTION OF NEW BLDG JOBSITE IS FENCED & GRADED. I OBSERVED THAT THE CONSTRUCTION FENCE INSTALLED ALONG PERIMETER OF EXP#1,HAS NO VIEWING PANELS IN PLACE AS #35350718R | Mar 21, 2019 IN VIOLATION | $400 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |