30 floors · 275 apartments · 441,063 sq ft · built 1929 · class D4 · owner of record: Stgeorge Tower & Grill Owners
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2025-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-04 (Accepted). Agency page | Dec 31, 2026 in 70 days | 3 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 441,063 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $49,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 853 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 231). Agency page | Dec 31, 2031 in 1896 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 8, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED APPROX 6 HVAC SYSTEMS INSTALLED TO 5TH FLOOR (TERRACE) 100% COMPLETED. JOB NO. B01202528-P1 WAS APPROVED ON 7/14/26 HOWEVER NO PERMIT WAS ISSUED.ECB ISSUED., OBTAIN ALL PERMITS #39207332H | Dec 16, 2026 PENDING | $1,250 |
| Oct 8, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. IT WAS OBSERVED THAT THE BALCONY OF APARTMENT 5-K IS BEING USED TO STORE CONSTRUCTION MATERIALS. ADDITIONALLY, BRICKS, TILES, AND SCAFFOLDING MATERIALS WERE NOTED BEIN #39163075Y | Jul 13, 2026 IN VIOLATION | $3,125 |
| Jul 18, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. OBSERVED BALCONY FROM APT.5-K BEING USED TO STORE CONST. MATERIAL ALSO OBSERVED DEBRIS /NAILS ON BALCONY., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING; MAINTAIN ADEQUA #39154098M | Apr 20, 2026 IN VIOLATION | $1,250 |
| Jul 1, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR FACADE AND APPURTENANCES. NOTE BROKEN GLASS PANE WINDOW AT 3RD STORY AND SPALLED BRICK/MASONRY ARCHES AT 5TH STORY OF EXPOSURE #1(WEST). REMEDY: MAINTAIN EXTERIOR FACADE TAKE SAFETY #35683631J | Sep 4, 2024 IN VIOLATION | $0 |
| Nov 24, 2023 | Unknown CLASS - 1 WORKER FELL OFF FROM LADDER BET. 4TH/5TH FLOOR TERRACE: INSPECTION REVEALS, INADEQUATE EGRESS /UNSAFE LADDER WORKER WAS TAKEN TO THE HOSPITAL. ALT JOB# B00846431, FAILED TO SUBMIT REPORT WITHIN 3 BUSINESS DAYS #39523610N | Jan 13, 2025 IN VIOLATION | $10,000 |
| Dec 13, 2021 | Construction CLASS - 2 AT TIME OF INSPECTION, FAILURE TO FILE FOR FINAL INSPECTION OR SIGN OFF FOR ALT 3 #321749355, EXPIRED 12-09-2018; 28-116.4, COMPLY WITH CODE; FILE FOR FINAL INSPECTION, SIGN OFF JOB #39052693J | Aug 29, 2022 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 22, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO MULTIPLE BROKEN WINDOWS NEAR THE MAIN ENTR ANCE OF EXP1 WEST ELEV.SEVERELY CRACKED/SHIFTED/DISPLACED MASONRY AT E XP2 NORTH ELEV.REMEDY:IMMEDIATEL PROVIDE SAFETY MEASURES TO SECURE & P ROTECT THE PUBLIC.MAKE IMMEDIATE REPAIRS UNDER THE SUPERVISION OF A LI CENSED PROFESSIO #FA30201JP | DOB VIOLATION - ACTIVE |
| Jul 8, 2021 | ELEVATOR #9027/705140 | DOB VIOLATION - ACTIVE |
| May 27, 2020 | ELEVATOR #9027/682115 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21241 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21243 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21242 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 5, 2021 | A | Apt 25F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE VENTILATION SYSTEM IN THE BATHROOM LOCATED AT APT 25F, 25th STORY, 3rd APARTMENT FROM NORTH AT EAST | Jun 8, 2021 |
| Aug 7, 2018 | B | Apt 21A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS LOWER SASH WINDOW IN THE KITCHEN LOCATED AT APT 21A, 21st STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 11, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED APPROX 6 HVAC SYSTEMS INSTALLED TO 5TH FLOOR (TERRACE) 100% COMPLETED. JOB NO. B01202528-P1 WAS APPROVED ON 7/14/26 HOWEVER NO PERMIT WAS ISSUED.ECB ISSUED., OBTAIN ALL PERMITS | Open |
| Jul 31, 2026 | DOB | LANDMARK: | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 9:43 AM ET. BBL 3002310019.