5 floors · 74,191 sq ft · built 1900 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 74,191 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 309). Agency page | Dec 31, 2029 in 1158 days | Next due 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-05 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 15, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.REISSUE#35721030Z NOTED:AT THE CELLAR LEVEL AT BOILER RM/ACCESS STAIR VAULT,WATER PENETRATION CAUSING DAMAGE TO WALLS AND CEILING.REM:REPAIR/REPLACE. #35734559L | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 15, 2026 | Construction CLASS - 2 REISSUE#35721031K FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THERE ARE SEVERAL DOORS THROUGHOUT THE SCHOOL THAT ARE NOT OPERATING CORRECTLY.VARIOUS PROBLEMS,VARIOUS REASONS.REM:REPAIR/REPLACE P #35734558J | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 1, 2025 | Construction CLASS - 2 RE-ISSUE #35684745M. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT T. O. I. THERE SEVERAL DOORS, SCATTERED THROUGH THE SCHOOL THAT ARE NOT OPERATING CORRECTLY. AT GYM, CAFETERIA AND LIBRARY A #35721031K | Aug 29, 2025 POP/IN-VIO | $0 |
| Aug 1, 2025 | Construction CLASS - 2 RE-ISSUE #35684746Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT STAIR VAULT AREA AT CELLAR, WATER INFILTRATION AT WALLS AND CEILING IS OBVIOUS. REMEDY: REPAIR/REPLACE. #35721030Z | Aug 29, 2025 POP/IN-VIO | $0 |
| Sep 3, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED INTERIOR THE PROOF SELF CLOSING DOORS NOT WORKING PROPERLY AT 5TH FL STAIR F,RM 505,GYM ENTRY,RM 306,309,311,LIBRARY,1ST FL STAIR C & CAFETERIA KITCHE #35684745M | Nov 7, 2024 POP/IN-VIO | $0 |
| Sep 3, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT CELLAR LEVEL ACROSS STAIR VAULT & BOILER,EVIDENCE OF WATER INFILTRATION THROUGH WALLS & CEILING.REM:REPAIR AND/OR REPLACE. #35684746Y | Nov 7, 2024 POP/IN-VIO | $0 |
| Oct 11, 2023 | Construction CLASS - 2 A8-I OBSERVED AN ACTIVE CONSTRUCTION SITE W/ DEBRIS & MATERIALS (NAILS, METAL, PLASTIC, BAGS, WOOD, & BRICK) STREWN ABOUT THE PIPE SCAFFOLD ON ALL LEVELS THROUGHOUT, ALONG LUDLOW STREET, ADJACENT TO SCHOOL COUR #39096862X | Dec 21, 2023 IN VIOLATION | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 15, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.REISSUE#35721030Z NOTED:AT THE CELLAR LEVEL AT BOILER RM/ACCESS STAIR VAULT,WATER PENETRATION CAUSING DAMAGE TO WALLS AND CEILING.REM:REPAIR/REPLACE. | Open |
| Jul 15, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:THERE WERE SEVERAL EMERGENCY EXIT LIGHTS THAT WERE NOT OPERATIONAL WHE | Closed |
| Jul 15, 2026 | ECB | Construction: REISSUE#35721031K FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THERE ARE SEVERAL DOORS THROUGHOUT THE SCHOOL THAT ARE NOT OPERATING CORRECTLY.VARIOUS PROBLEMS,VARIOUS REASONS.REM:REPAIR/REPLACE P | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 8:49 AM ET. BBL 1003090001.