5 floors · 3 apartments · 12,900 sq ft · built 1858 · class O8 · owner of record: 44 Hudson Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 792 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 21, 2026 | Construction CLASS - 1 AT FLOOR 3 OBSERVED APPROX 100 BLACK BAGS ON FLOOR. POTENTIAL FOR OVER LOADING FLOOR. ALSO FLOORS 3,4,5 LARGE PILES OF CAST IRON PIPING. POTENTIAL FOR OVER LOADING., REPAIR AND/REPLACE #39208795Z | Dec 31, 2026 PENDING | $2,500 |
| Oct 21, 2026 | Unknown CLASS - 1 OBSERVED OPEN ELECTRIC PANEL AT 2ND FLOOR. WORKER ON LADDER STANDING DIRECTLY IN FRONT. POTENTIAL FOR ELECTRIC SHOCK OR ELECTROCUTION., COMPLY WITH EC #39208794R | Dec 31, 2026 PENDING | $1,600 |
| Oct 21, 2026 | Construction CLASS - 1 OBSERVED NEW CAST IRON WASTE LINES BEING INSTALLED FROM CELLAR THROUGH FLOOR 5. AT FLOOR 2 WORKERS ACTIVLY INSTALLING PIPE. FLOORS 3,4,5 PILES OF OLD CAST PIPING AND NEW CAST PIPING ON FLOORS., OBTAIN PERMIT #39208790J | Dec 31, 2026 PENDING | $2,500 |
| Oct 21, 2026 | Unknown CLASS - 1 YELLOW ROMEX TEMO POWER AND LIGHT THROUGHOUT BUILDING FLOORS 3,4,5 AND STAIRS. PERMIT FOR TEMP POWER AND LIGHT UNDER JOB # M00165600 EXPIRED ON 11/01/2025., OBTAIN PERMIT #39208791L | Dec 31, 2026 PENDING | $2,500 |
| Oct 21, 2026 | Unknown CLASS - 1 OBSERVED IN CELLAR AND FLOORS 2 AND 3 OPEN ELECTRICAL BOXES, ELECTRICAL CABLE HANGING. OPEN ENDED WIRES. AT FLOOR 5 NEW ELECTRIC SERVICE PANEL BEING INSTALLED. NO PERMIT ON FILE AT TIME OF INSPECTION. WORK APPR #39208793P | Dec 31, 2026 PENDING | $2,500 |
| Oct 21, 2026 | Construction CLASS - 1 OBSERVED ON FLOORS 3 AND 4 OPEN FLOOR JOISTS, NEW WOOD FRAMING AT FLOOR, NEW SUBFLOORING BEING INSTALLED. FLOORS 3,4,5 OPEN CEILINGS, OPEN MECHANICAL CHASE., OBTAIN PERMIT #39208792N | Dec 31, 2026 PENDING | $2,500 |
| Oct 21, 2026 | Construction CLASS - 2 WORK DOES NOT CONFORM TO DEPT DWGS. SECOND FLOOR RAMP AND "EXAM" ROOM WAS NOT INSTALLED. AT FIRST FLOOR CURVED RECEPTION WALL AND SOUTH WALLS NOT INSTALLED. NO PAA ON FILE AT TIME OF INSPECTION., CONFORM WORK T #39208780X | Dec 31, 2026 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Jan 16, 2020 | CONSTRUCTION THE PERMIT HOLDER OF RECORD HAS INFORMED THE DEPARTMENT THAT HE OR SHE HAS WITHDRAWN FROM THE PROJECT. #20-00159 | DOB VIOLATION - ACTIVE |
| Mar 14, 2019 | ELEVATOR #9027/645260 | DOB VIOLATION - ACTIVE |
| Jan 4, 1994 | CONSTRUCTION #01B02 | VIOLATION UNSERVED ECB-ACTIVE |
| Mar 25, 1993 | CONSTRUCTION #A2GG04 | VIOLATION UNSERVED ECB-ACTIVE |
| May 13, 1992 | CONSTRUCTION #A1JK11 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 21, 2026 | ECB | Construction: AT FLOOR 3 OBSERVED APPROX 100 BLACK BAGS ON FLOOR. POTENTIAL FOR OVER LOADING FLOOR. ALSO FLOORS 3,4,5 LARGE PILES OF CAST IRON PIPING. POTENTIAL FOR OVER LOADING., REPAIR AND/REPLACE | Open |
| Oct 21, 2026 | ECB | Unknown: OBSERVED OPEN ELECTRIC PANEL AT 2ND FLOOR. WORKER ON LADDER STANDING DIRECTLY IN FRONT. POTENTIAL FOR ELECTRIC SHOCK OR ELECTROCUTION., COMPLY WITH EC | Open |
| Oct 21, 2026 | ECB | Construction: OBSERVED NEW CAST IRON WASTE LINES BEING INSTALLED FROM CELLAR THROUGH FLOOR 5. AT FLOOR 2 WORKERS ACTIVLY INSTALLING PIPE. FLOORS 3,4,5 PILES OF OLD CAST PIPING AND NEW CAST PIPING ON FLOORS., OBTAIN PERMIT | Open |
| Oct 21, 2026 | ECB | Unknown: YELLOW ROMEX TEMO POWER AND LIGHT THROUGHOUT BUILDING FLOORS 3,4,5 AND STAIRS. PERMIT FOR TEMP POWER AND LIGHT UNDER JOB # M00165600 EXPIRED ON 11/01/2025., OBTAIN PERMIT | Open |
| Oct 21, 2026 | ECB | Unknown: OBSERVED IN CELLAR AND FLOORS 2 AND 3 OPEN ELECTRICAL BOXES, ELECTRICAL CABLE HANGING. OPEN ENDED WIRES. AT FLOOR 5 NEW ELECTRIC SERVICE PANEL BEING INSTALLED. NO PERMIT ON FILE AT TIME OF INSPECTION. WORK APPR | Open |
| Oct 21, 2026 | ECB | Construction: OBSERVED ON FLOORS 3 AND 4 OPEN FLOOR JOISTS, NEW WOOD FRAMING AT FLOOR, NEW SUBFLOORING BEING INSTALLED. FLOORS 3,4,5 OPEN CEILINGS, OPEN MECHANICAL CHASE., OBTAIN PERMIT | Open |
| Oct 21, 2026 | ECB | Construction: WORK DOES NOT CONFORM TO DEPT DWGS. SECOND FLOOR RAMP AND "EXAM" ROOM WAS NOT INSTALLED. AT FIRST FLOOR CURVED RECEPTION WALL AND SOUTH WALLS NOT INSTALLED. NO PAA ON FILE AT TIME OF INSPECTION., CONFORM WORK T | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 12:25 AM ET. BBL 1001440020.