Brooklyn · Block 255 · Lot 1 · 11201

44 Court Street

12 floors · 139,273 sq ft · built 1901 · class O6 · owner of record: 44 Court Street

30open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
99dto Facade inspection report (Cycle 10A)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $465,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 99 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 139,273 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 255). Agency page

Dec 31, 2035
in 3334 days
Next due 2035
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-08 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (13)
IssuedViolationHearingBalance
Jun 17, 2024Construction CLASS - 2
A.C. 27.929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY AREGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE
#37028919K
Sep 25, 2024
IN VIOLATION
$0
Mar 8, 2023Elevators CLASS - 2
ADJUST TOP LANDING HATCH DOORS IN ORDER TO PREVENT GAP. PROVIDE KEY TO CONTROLLER.
#39081031N
May 17, 2023
DEFAULT
$0
Mar 8, 2023Elevators CLASS - 2
RESTORE FULL SEVICE TO THIS DEVICE.
#39081034Z
May 17, 2023
DEFAULT
$0
Feb 28, 2023Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE
#37025375H
Jun 28, 2023
DEFAULT
$0
Dec 2, 2022Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909137.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE
#37024181P
Feb 22, 2023
DEFAULT
$0
Dec 9, 2021Construction CLASS - 2
AT TIME OF INSPECTION, FAILURE TO SIGN OFF ALT 1 JOB #320485890, PERMIT EXPIRED 06-06-2015; 28-116.4, COMPLY WITH CODE; GET JOB SIGNED OFF
#39052517K
Apr 13, 2022
DEFAULT
$0
Dec 9, 2021Construction CLASS - 2
AT TIME OF INSPECTION, PREMISES ALTERED UNDER ALT 1 JOB #320485890 OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY - AGGRAVATED 1 - RECURRING CONDITION, OBTAIN A VALID C OF O OR DISCONTINUE ILLEGAL OCCUPANCY;
#39052518M
Apr 13, 2022
DEFAULT
$0
Nov 1, 2021Construction CLASS - 2
FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN E
#37022544X
Apr 27, 2022
ADMIT/IN-VIO
$0
Mar 30, 2021Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE
#37020816L
Aug 25, 2021
DEFAULT
$0
Dec 31, 2020Construction CLASS - 2
AT TIME OF INSPECTION, PREMISES ALTERED UNDER JOB #320485890 OCCUPIED AS AN OFFICE BUILDING WITHOUT A VALID CERTIFICATE OF OCCUPANCY, OBTAIN A VALID C OF O OR DISCONTINUE ILLEGAL OCCUPANCY; OBTAIN CERTIFICATE O
#39034147N
May 5, 2021
DEFAULT
$0
Nov 15, 2019Construction CLASS - 2
BC27-929.1/A.C 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF FULL SYTEM OF AUTOMATIC SPRINKLER AND FILE A FINAL SPRINKLER REPORT PREPAREDBY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDI
#37016852R
Dec 3, 2020
DEFAULT
$0
Jul 10, 2015Construction CLASS - 1
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATION.NOTE:OBSERVED SUPPORTED SCAFFOLD IN PROGRESS AT INSTALLATIONUNDER PERMIT #321136016-01-EQ-SF AT EXP1 (COURT ST) SECURE PIN AT SUPP
#35132496P
Aug 24, 2015
WRITTEN OFF
$0
Nov 22, 2011Construction CLASS - 3
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR THIS PROCERT ALTII JOB#310036216 DWG:10/31/07. NOTED:1) AT 5TH FLR, NORTH(WEST) REAR EXIT, PLAN PROPOSES A PARTITION DIVID
#34916366X
Jan 9, 2012
DEFAULT
$0
DOB (9)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#01018
DOB VIOLATION - ACTIVE
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2102096
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2002889
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF01025
DOB VIOLATION - ACTIVE
Jan 31, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
#01294
DOB VIOLATION - ACTIVE
Mar 22, 2011ELEVATOR

#9028/373828
DOB VIOLATION - ACTIVE
Mar 21, 2011ELEVATOR

#9028/373828
DOB VIOLATION - ACTIVE
Jan 3, 2001PLUMBING
PLUMBING WORK WITHOUT A PERMIT. INSTALLATION OF NEW W/C & LAV TOWER B REMEDY: OBTAIN A PERMIT IF FEASBLE OR RESTORE TO PRIOR LEGAL CONDITION
#301
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#28484
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
Jan 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 10:55 AM ET. BBL 3002550001.