2 floors · 1 apartments · 24,630 sq ft · built 1931 · class K2 · owner of record: Douglaston Corner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 295 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 416 days | Next cycle year 2027 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-30 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 29, 2021 | Boilers CLASS - 1 C/U;18,50A,33,50A,51:FULTON V.T. BOILER,15HP,NB100989,NP SPM,OIL/FD 2006 (18)CORROSION,SCALE ACCUMULATION AND FLUE GAS LEAKAGE AT LOWER HANDHOLE OPENING(A)(B) (33)BOILER BASE CORRODED&LEAKING. 50(A)NO RECORD OF #32099178Z | Mar 29, 2022 IN VIOLATION | $1,250 |
| Aug 11, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATIONG CONDITIONS CITED IN VIO#35320888M ISSUED ON 03/16/2018 PURSUANT TO 28-201.2;28-204.1;1RCNY 102.01. #35590107K | Jan 4, 2022 DEFAULT | $0 |
| Oct 1, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DOB.RESPONDENT FAILED TO COMPLY WITH COMMISSIONERS ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE A CERTIFICATE OF COR #35450381Z | Dec 24, 2019 IN VIOLATION | $0 |
| Oct 1, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITHT HE DOB RESPONDENT FAILED TO COMPLY WITH COMMISSIONERS ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE A CERTIFICATE OF COR #35450379J | Dec 24, 2019 IN VIOLATION | $0 |
| Oct 1, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.RESPONDENT FAILED TO COMPLY WITH COMMISSIONERS ORDER TO CORRECT THE VIOLATING CONDITIONS AND FILE #35450380R | Dec 24, 2019 IN VIOLATION | $0 |
| Mar 16, 2018 | Construction CLASS - 2 WORK WITHOUT A PERMIT.WORK NOTED:AS 1ST FLOOR HAVING ERECTED FULL HEIGHT PARTITIONS TO CREATE 4 MASSAGE ROOMS WITH TABLE COMMERCIAL SINK(WATER,WATE LINE'S)IN FRONT(FACADE)PREMISES ERECTED AWNING SIGN "DOUGLASTO #35320888M | Oct 24, 2018 IN VIOLATION | $0 |
| Mar 16, 2018 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BUILDING DEPARTMENT RECORDS.1ST FLOOR OCCUPY AS AN ADULT PHYSICAL CULTURE ESTABLISHMENT & PHYSICALCULTURE ESTABLISHMENT "DOUGLASTON FOOT RUB" MASSAGE PARLOR WITHOUT BSA #35320887K | Oct 24, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00444 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03957 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02825 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01597 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00459 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01669 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #03425 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #04584 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19611 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00872 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01996 | DOB VIOLATION - ACTIVE |
| Apr 27, 2022 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00451 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #00981 | DOB VIOLATION - ACTIVE |
| Jun 13, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00480 | DOB VIOLATION - ACTIVE |
| Jun 3, 1998 | CONSTRUCTION #STM03VW | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 27, 2022 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jun 13, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 11:08 AM ET. BBL 4081110001.