1 floors · 4,595 sq ft · built 1962 · class K1 · owner of record: Cvc Sunnyside Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 3, 2020 | Boilers CLASS - 2 50A,50B,50C:FULTON V.T. BOILER;NB52322;H.P;OIL-FIRED,BUILT 1987. 50A THERMAL WEAR ON FLUE PIPE SYSTEM. REPLACE ENTIRE FLUE PIPE RUN W/ 22 GAUGE MATERIAL AND REQUIRED FITTINGS&SUPPORTS. 50B INSTALL CLEAN OUT DOO #32098689X | Mar 2, 2021 IN VIOLATION | $0 |
| Nov 22, 2019 | Construction CLASS - 1 AREA REQUIRED TO BE MAINTAINED CLEAR FOR READY AND SAFE OPERATION OF ELECTRICAL SERVICE EQUIPMENT IS BEING USED FOR STORAGE IN VIOLATION OF THE ELECTRICAL CODE., REPAIR AND/REPLACE #39013392Y | Jan 7, 2020 ADMIT/IN-VIO | $0 |
| Nov 22, 2019 | Unknown CLASS - 1 IMPROPERLY WIRED, GROUNDED, AND SUPPORTED ELECTRICAL EQUIPMENT AND CABLES, AS WELL AS, FLEXIBLE CORDS USED AS A SUBSTITUTE FOR PERMANENT WIRING THROUGHOUT BASEMENT., COMPLY WITH EC #39013396L | Jan 7, 2020 ADMIT/IN-VIO | $0 |
| May 17, 2010 | Construction CLASS - 2 WORK W/O A PERMIT WORK NOTED AS FOLLOWS AT CELLAR FULL HEIGHT PARTITION WALL IN PLACE SUBDIVIDING CELLAR STORAGE SPACE W/ WOOD DOOR IN PLACEAND FRAME WOOD STUDS INSTALL BESIDE PARTITION WALL AND NEW STRINGER ST #34843340N | Jul 6, 2010 WRITTEN OFF | $0 |
| May 17, 2010 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG A CODE COMPLIANT MANNER AT CELLAR 1ST FL DEBRIS INDENT IN EXCESS OF APPX 10CUBIS YARDS AT CELLAR IMPROPER STORAGE HOUSEHOLD ITEMS SCATTERED THROUGHOUT CELLAR REM: CLEAN UP REMOVE DEBRIS #34843341P | Jul 6, 2010 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00730 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01579 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00341 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01551 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION #01069 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #01090 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00705 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00704 | DOB VIOLATION - ACTIVE |
| Jun 22, 2018 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION #00370 | DOB VIOLATION - ACTIVE |
| May 16, 2000 | CONSTRUCTION #ZSTF05GN | DOB VIOLATION - ACTIVE |
| May 16, 2000 | CONSTRUCTION #ZC2STF05GN | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2019 Internal Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for HP Device | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 22, 2018 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 7:07 PM ET. BBL 4022880032.