8 floors · 18,104 sq ft · built 2019 · class H3 · owner of record: Pride Developers Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 479 days | No Cycle 10 report on record yet |
None open.
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 24, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED PLASTIC FLEX PIPE BEING TIED TO CAST IRON WASTE FROM WASHING MACHINE CONTRARY TO PC 701.9 PLASTIC PIPE. PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 8:32 PM ET. BBL 2030470063.