Manhattan · Block 1807 · Lot 30 · 10035

438 East 120 Street

6 floors · 42 apartments · 51,546 sq ft · built 1900 · class D3 · owner of record: Nycha Triborough Preservation Hdfc

6open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
43dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 51,546 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1807). Agency page

Dec 31, 2027
in 408 days
Next due 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-03 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Sep 7, 2021CONSTRUCTION
EMERGENCY WORK:MULTIPLE DWELLING THAT SUSTAINED FIRE DAMAGE ON 9/4/21 THE ROOF IS OPEN AT LINES C+D.THE 5TH FLR JOIST WERE SEVERELY DAMAGED AT S-E CORNER.THERE IS POTENTIAL OF COLLAPSE.OWNR TO IMMD DO FOLLOWING TMP SEAL ALL ROOF OPNGS.INSTL TMP SHOR@5FL JOIST.ALL SHORNG WORK TO BE DSGND&INSTL UNDR D
#FEU11101XC
DOB VIOLATION - ACTIVE
Sep 7, 2021CONSTRUCTION
FTM:MULTI DWELLING THAT WAS DAMGED BY FIRE ON 9/4/21.SEVERE FIRE DAMGE NOTED@LINE C 4,5+6FLRS.PARTLY COLLAPSED FLR AT S-E CORNER,WATER DAMAGE AND MISSING WINDOWS IN MANY LOCATIONS.OPENED ROOF.COLLAPSED CEILINGS OWNER TO ENGAGE NYS PE+LIC'D CONTRACTOR TO EVALUATE THE BUILDING AND REPAIR UNDER PERMIT.
#FEU11102XC
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 8, 2026GHG Emissions - LL97 FTF-EN-LL97321
FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B).
Active
Jun 24, 2026GHG Emissions - LL97 FTF-EN-LL97321
Active
HPD (2) · C 1 · B 1 · A 0
IssuedClassViolationCorrect by
May 1, 2026CApt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''A''May 27, 2026
Sep 3, 2024BApt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARD WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 8, 2024

Issued in the last 120 days

DateSourceWhatNow
Oct 8, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B).Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 1:22 PM ET. BBL 1018070030.

Look up another building