2 floors · 2 apartments · 2,400 sq ft · built 1931 · class S2 · owner of record: Minuto, Angela
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-29 (Accepted). Agency page | Dec 31, 2026 in 70 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 435 days | Next cycle year 2027 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 21, 2020 | CONSTRUCTION AT TIME OF INSPECTIOMN DAMAGED OBSERVED TO HAVE BEEN SUSTAINED TO PREM ISES DUE TO FDNY TRUCK IMPACTING BUILDING DISLOGING APPROXIMATELY 15' OF PARTY WALL (CMU WALL) ST THE FRONT OF PROPERTY , ALSO DAMAGING PARTITIONS & ENTRY WAY #CER02MP | DOB VIOLATION - ACTIVE |
| Dec 21, 2020 | CONSTRUCTION EMERG WORK ORDR-IMPACT FDNY TRK INTO FRONT ADJ BLDG 12/21/20.20'WX80'D WOOD JOIST OVER CMU WALL SUFFERED STRUCTL DMG-10'+- SHRD CMU PRTY WALL DISLGD&PART COLPSD 1-2FL-2FL&ROOF FLRS IMPRP SUPPRT.BLD STRUCT COMPROM DNGR PUBL.OWNR IMMED ENGAG NYSPE&CONTRCT-SHORE AREA STRCTL COMPR&IMPRP SUPPRD.ERCT T-BR #FEU31502FF | DOB VIOLATION - ACTIVE |
| Dec 21, 2020 | CONSTRUCTION FTM:DUE IMPACT FDNY TRUCK INTO FRNT ADJ BLDG @ 439 AVE U 12/21/20.WOOD JOIST OVER SOLID/CMU WALLS SUFFRD STRCTL DMG FOLLOWS:FRONT 10'SHRD CMU PRTYWALL W/439 AVE U DISLODG PART COLP,1-2FL 2ND&ROOF FLRS IMPRP SUPRT BLD STRCTLY COMPRM&IMPRP SUPRT.OWNR HIRE NYSPE&ENDORSE CONTRCT TO EVAL WHOLE BLD&OBTN P #FEU31503FF | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #07613 | DOB VIOLATION - ACTIVE |
| Feb 23, 1996 | CONSTRUCTION #141JB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 10:09 PM ET. BBL 3071060034.