Bronx · Block 5634 · Lot 126 · 10464

435 City Island Avenue

2.5 floors · 2 apartments · 5,343 sq ft · built 1935 · class K4 · owner of record: D & D Bowne St. Realty Corp.

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 774 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#16999
DOB VIOLATION - ACTIVE
Dec 16, 1993CONSTRUCTION

#13JP01
DOB VIOLATION - ACTIVE
Apr 23, 1993LOCAL LAW 62/91 - BOILERS

#00739
DOB VIOLATION - ACTIVE
Jan 10, 1992CONSTRUCTION

#13M01
VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
Jan 10, 1992CONSTRUCTION

#13MO1
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 8:25 AM ET. BBL 2056340126.

Look up another building