5 floors · 109,258 sq ft · built 1992 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 109,258 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 435 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2167). Agency page | Dec 31, 2027 in 435 days | Next due 2027 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-07 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: UPON INSPECTION WHEN TESTED GYM EMERGENCY AND AUDITORIUM DID NOT #35729075Z | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: UPON INSPECTION FIRE RATED/SMOKE DOORS NOT SELF-CLOSING ON CLASSROOMS DUE TO HARDWARE OR BINDING 510, 505, 502, 311, 321, 324, 204, 205, 102, INCLUD #35729074R | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 24, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: UPON INSPECTION, EXTERIOR DOOR NOT SELF-CLOSING AT EXIT 8 WHEN TESTED. REMEDY: REPAIR/REPLACE DOOR. #35729077M | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: UPON INSPECTION A BROKEN GLASS IN CLASSROOM 207 2ND FLOOR. REMEDY: REPAIR AND/OR REPLACE. #35729076K | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 21, 2026 | Unknown CLASS - 2 ATOI OBSERVED. AT EXPO: #2 CONSTRUCTION FENCE IN PLACE WITHOUT PROJECT INFORMATION PANEL, SMOKING SIGNS,RENDERING,ELEVATION, DRAWING, ZONING DIAGRAM OF THE BUILDING EXTERIOR THAT DOES NOT CONTAIN LOGS OR COMMER #39550680M | Jan 12, 2027 | $2,500 |
| Jul 11, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: TWO MASONRY PILARS AT EXPO #1 MAIN ENTRANCE COURTYARD IN DISREPAIR WITH VERTICAL CRACKS THROUGH BRICK & MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE #35674723M | Nov 2, 2023 POP/IN-VIO | $0 |
| Jul 11, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED STONE STEPS AT EXPO #2 (WEST 187 ST) SIDE LEADING PLAYGROUND WITH MISSING CHUNK OF STONE ALONG HANDRAIL POST AND TOP STEP ADJACENT TO MASONRY WALL WI #35674721Z | Nov 2, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 30, 2003 | MARQUEE #0416 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01817 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 21, 2026, 9:07 AM ET. BBL 1021670029.