6 floors · 30 apartments · 21,708 sq ft · built 1930 · class C1 · owner of record: 432 W 163 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-24 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#813806. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT #37012788N | Mar 7, 2019 DEFAULT | $5,000 |
| Jan 24, 2009 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER IN THATIN APT 30 ON 6TH FL WORKERS WERE IN PROCESS OF ERECTING WOODEN INTERIOR PARTITIONS. REMEDY: COMPLY W/STOP WORK ORDER. #34741194R | Mar 12, 2009 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 17, 2009 | CONSTRUCTION #1201VP | DOB VIOLATION - ACTIVE |
| Oct 11, 2008 | CONSTRUCTION #NE01GA | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Oct 11, 2008 | CONSTRUCTION WORK W/OUT PERMIT #ERDM01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| May 21, 2008 | CONSTRUCTION #1204DB | DOB VIOLATION - ACTIVE |
| Dec 21, 2007 | CONSTRUCTION #1207DB | DOB VIOLATION - ACTIVE |
| Dec 19, 2007 | CONSTRUCTION #1202DM | DOB VIOLATION - ACTIVE |
| Dec 12, 2007 | CONSTRUCTION #1203DB | DOB VIOLATION - ACTIVE |
| Oct 26, 2007 | CONSTRUCTION #12DB01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Oct 26, 2007 | CONSTRUCTION #12DB02 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 29, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM | Dec 5, 2024 |
| Sep 3, 2024 | C | Apt 30 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 30, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 29, 2024 |
| Mar 12, 2012 | B | Apt 19 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 19, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 16, 2012 |
| Mar 12, 2012 | B | Apt 19 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 19, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 16, 2012 |
| Jun 5, 2006 | B | Apt 20 · § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 20, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 15, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 10:19 AM ET. BBL 1021100018.