Brooklyn · Block 4880 · Lot 36 · 11203

4317 Church Avenue

2 floors · 2 apartments · 2,600 sq ft · built 1931 · class S2 · owner of record: Andre, Yvetaud

73open violations
$3,125ECB/OATH penalties owed
2HPD class C (immediately hazardous)
408dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027

Open violations

ECB / OATH (7) · $3,125 owed
IssuedViolationHearingBalance
Mar 16, 2018Boilers CLASS - 2
AS PER CLASS 2 (B265) 28.303.7 FAILURE TO FILE A COMPLETE BOILER INSP CTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT INITIAL INSPECTION REPORT.
#32093329J
Oct 3, 2018
DEFAULT
$3,125
Jul 1, 2004Construction Hazardous
FAILURE TO MAINTAIN BLDG WALL NOTE: AT FRONT FACADE, 2-TO PARAPET LOOSE & MISSING BRICKS WITH MORTAR MISSING FROM JOINTS & MISSING COPING AT PARAPET REMEDY: MAINTAIN BLDG WALL
#34438592K
Aug 16, 2004
WRITTEN OFF
$0
Jan 13, 2004Construction Hazardous
FAILURE TO MAINTAIN EXTERIOR WALL. LOOSE BRICK THROUGHOUT. PARAPET WALL HAS MISSING COPING. REMEDY: MAINTAIN BUILDING/MAKE ALL NECESSARY REPAIRS
#34399344M
Mar 1, 2004
WRITTEN OFF
$0
Sep 3, 2003Construction Non-Hazardous
WORK WITHOUT PERMIT:NOTED AT REAR OF IST FLOOR A WOOD FRAME STRUCTURE WITH CONCREATE BLOCK SIDE WALLS AND A SHED TYPE ROOF ATTACHED TO REAR OF BLDG APPROX SIZE 8'Y 18' AT CORNERS OF PROPERTY AT REAR EAST & WEST
#34410420J
Oct 20, 2003
WRITTEN OFF
$0
Jun 19, 2003Construction Non-Hazardous
WORK WITHOUT A PERMIT WORK NOTED HAVING CONSTRUCTED A WOODEN DOME CEILING APPROX 12 BELOW EXISTING 2X4 DOOR CEILING AND APPROX 4FT WIDE FROM PERIMETER WALLS AT 1ST STORY COMMERCIAL SPACE ERECTED A WOOD AND MASO
#34407288Y
Aug 11, 2003
WRITTEN OFF
$0
Jun 19, 2003Construction Hazardous
FAILURE TO MAINTAIN EXTERIOR BLDG WALLS DEFECTS ARE LOOSE AND WINKEY BRICK WORK THROUGHOUT PARAPET AT BLDG FRONT 2 BROKEN AND PART MISSING MASONNRY COPING AT PARAPER FRONT REMEDY OBTAIN A PERMIT AND MAKE ALL
#34407287M
Aug 11, 2003
WRITTEN OFF
$0
May 27, 1999Construction Non-Hazardous
WORK WITHOUT A OERMIT WORK NOTED CONSTRCUTION OF A CONC BLOCK EXTENSION AT REAR OF BLDG EXTENSION IS 50% COMPLETED NO ROOF ANDOCCUPIES ENTIRE YARD SET BO DEC APPROX SIZE OF EXIT IS 18X20 REMEDY OBTIAN PERMIT
#34210068N
Jul 12, 1999
WRITTEN OFF
$0
DOB (31)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#12400
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#11282
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#35985
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#15816
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#16708
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#37189
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#13682
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#08443
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#10572
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#08354
DOB VIOLATION - ACTIVE
Mar 1, 2013LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
#09927
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#13111
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#15278
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#14529
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#14480
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#14782
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#14285
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#15286
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#16473
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#20697
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#22148
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#21348
DOB VIOLATION - ACTIVE
May 27, 1999CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: CONSTRUCTION OF A CONCRETE BLOCK EXTENSION AT REAR OF BUILDING. EXTENSION IS 50% COMPLETED (NO ROOF) AND OCUPIES ENTIRE YARD SET BACK. APPROX SIZE IS 18'X 20' REMEDY: OBTAIN A PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
#17RR06
VIOLATION WORK WITHOUT PERMIT - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#21178
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#235760
DOB VIOLATION - ACTIVE
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#26925
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#29054
DOB VIOLATION - ACTIVE
Jun 1, 1994LOCAL LAW 62/91 - BOILERS

#12533
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#27588
DOB VIOLATION - ACTIVE
Jun 1, 1993LOCAL LAW 62/91 - BOILERS

#12532
DOB VIOLATION - ACTIVE
Jul 18, 1991BOILER

#77679 01
DOB VIOLATION - ACTIVE
DOB NOW Safety (28)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Mar 1, 2013Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
Jan 1, 2009Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
May 4, 1998Boiler LL6291
Active
Sep 16, 1997Boiler LL6291
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jun 1, 1994Boiler LL6291
Active
Jun 1, 1993Boiler LL6291
Active
HPD (7) · C 2 · B 5 · A 0
IssuedClassViolationCorrect by
Jun 26, 2008BSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS IN UPPER SASH AT EAST WINDOW NORTHEAST ROOM, 2ND STORY APARTMENT 2R.Jul 31, 2008
Jun 26, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE GLASS IN LOWER SASH AT WEST WINDOW NORTHEAST ROOM, 2ND STORY APARTMENT 2R.Jul 31, 2008
Jun 26, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE REFRIGERATOR AT 2ND STORY APARTMENT 2R.Jul 31, 2008
Jun 26, 2008BSECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT 2ND STORY APARTMENT 2R.Jul 31, 2008
Jun 26, 2008BSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY AT 2ND STORY APARTMENT 2R.Jul 31, 2008
Jun 26, 2008CSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDER LOCK ON ENTRANCE DOOR TO 2ND STORY APARTMENT 2R.Jul 2, 2008
Jun 26, 2008CSECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB 2ND STORY APARTMENT 2R, BATHROOM.Jul 2, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 5:30 AM ET. BBL 3048800036.

Look up another building