2 floors · 2 apartments · 2,600 sq ft · built 1931 · class S2 · owner of record: Andre, Yvetaud
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 16, 2018 | Boilers CLASS - 2 AS PER CLASS 2 (B265) 28.303.7 FAILURE TO FILE A COMPLETE BOILER INSP CTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT INITIAL INSPECTION REPORT. #32093329J | Oct 3, 2018 DEFAULT | $3,125 |
| Jul 1, 2004 | Construction Hazardous FAILURE TO MAINTAIN BLDG WALL NOTE: AT FRONT FACADE, 2-TO PARAPET LOOSE & MISSING BRICKS WITH MORTAR MISSING FROM JOINTS & MISSING COPING AT PARAPET REMEDY: MAINTAIN BLDG WALL #34438592K | Aug 16, 2004 WRITTEN OFF | $0 |
| Jan 13, 2004 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR WALL. LOOSE BRICK THROUGHOUT. PARAPET WALL HAS MISSING COPING. REMEDY: MAINTAIN BUILDING/MAKE ALL NECESSARY REPAIRS #34399344M | Mar 1, 2004 WRITTEN OFF | $0 |
| Sep 3, 2003 | Construction Non-Hazardous WORK WITHOUT PERMIT:NOTED AT REAR OF IST FLOOR A WOOD FRAME STRUCTURE WITH CONCREATE BLOCK SIDE WALLS AND A SHED TYPE ROOF ATTACHED TO REAR OF BLDG APPROX SIZE 8'Y 18' AT CORNERS OF PROPERTY AT REAR EAST & WEST #34410420J | Oct 20, 2003 WRITTEN OFF | $0 |
| Jun 19, 2003 | Construction Non-Hazardous WORK WITHOUT A PERMIT WORK NOTED HAVING CONSTRUCTED A WOODEN DOME CEILING APPROX 12 BELOW EXISTING 2X4 DOOR CEILING AND APPROX 4FT WIDE FROM PERIMETER WALLS AT 1ST STORY COMMERCIAL SPACE ERECTED A WOOD AND MASO #34407288Y | Aug 11, 2003 WRITTEN OFF | $0 |
| Jun 19, 2003 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG WALLS DEFECTS ARE LOOSE AND WINKEY BRICK WORK THROUGHOUT PARAPET AT BLDG FRONT 2 BROKEN AND PART MISSING MASONNRY COPING AT PARAPER FRONT REMEDY OBTAIN A PERMIT AND MAKE ALL #34407287M | Aug 11, 2003 WRITTEN OFF | $0 |
| May 27, 1999 | Construction Non-Hazardous WORK WITHOUT A OERMIT WORK NOTED CONSTRCUTION OF A CONC BLOCK EXTENSION AT REAR OF BLDG EXTENSION IS 50% COMPLETED NO ROOF ANDOCCUPIES ENTIRE YARD SET BO DEC APPROX SIZE OF EXIT IS 18X20 REMEDY OBTIAN PERMIT #34210068N | Jul 12, 1999 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #12400 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #11282 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #35985 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #15816 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #16708 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #37189 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #13682 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #08443 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #10572 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #08354 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #09927 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #13111 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #15278 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #14529 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #14480 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #14782 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #14285 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #15286 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #16473 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #20697 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #22148 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #21348 | DOB VIOLATION - ACTIVE |
| May 27, 1999 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: CONSTRUCTION OF A CONCRETE BLOCK EXTENSION AT REAR OF BUILDING. EXTENSION IS 50% COMPLETED (NO ROOF) AND OCUPIES ENTIRE YARD SET BACK. APPROX SIZE IS 18'X 20' REMEDY: OBTAIN A PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION #17RR06 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #21178 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #235760 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #26925 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #29054 | DOB VIOLATION - ACTIVE |
| Jun 1, 1994 | LOCAL LAW 62/91 - BOILERS #12533 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #27588 | DOB VIOLATION - ACTIVE |
| Jun 1, 1993 | LOCAL LAW 62/91 - BOILERS #12532 | DOB VIOLATION - ACTIVE |
| Jul 18, 1991 | BOILER #77679 01 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 1, 1994 | Boiler LL6291 | Active |
| Jun 1, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 26, 2008 | B | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS IN UPPER SASH AT EAST WINDOW NORTHEAST ROOM, 2ND STORY APARTMENT 2R. | Jul 31, 2008 |
| Jun 26, 2008 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE GLASS IN LOWER SASH AT WEST WINDOW NORTHEAST ROOM, 2ND STORY APARTMENT 2R. | Jul 31, 2008 |
| Jun 26, 2008 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE REFRIGERATOR AT 2ND STORY APARTMENT 2R. | Jul 31, 2008 |
| Jun 26, 2008 | B | SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT 2ND STORY APARTMENT 2R. | Jul 31, 2008 |
| Jun 26, 2008 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY AT 2ND STORY APARTMENT 2R. | Jul 31, 2008 |
| Jun 26, 2008 | C | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDER LOCK ON ENTRANCE DOOR TO 2ND STORY APARTMENT 2R. | Jul 2, 2008 |
| Jun 26, 2008 | C | SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB 2ND STORY APARTMENT 2R, BATHROOM. | Jul 2, 2008 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 5:30 AM ET. BBL 3048800036.