1 floors · 1,676 sq ft · built 1931 · class G2 · owner of record: Concord Developments Housing Development Fund Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION, OBSERVED BRICK BULGING AND CRACKING ALONG THE NORTH WALL OF 415 CONCORD AVENUE ADJACENT TO THE EXCAVATION. REQUIRED PHYSICAL EXAMINATION RECORDS FOR THE ADJOINING PROPERTY DID NOT DOCUMEN #39559476X | Dec 4, 2026 PENDING | $2,500 |
| Aug 26, 2026 | Construction CLASS - 2 OBSERVED PROPOSED 11STORY MIXED USE BUILDING AT DEMOLITION PHASE WITH NO ACTIVE WORK AND AN OPEN EXCAVATION WITH NO FALL PROTECTION. AT TIME OF INSPECTION I OBSERVED AN ENTRANCE DOOR UNLOCKED AND OPEN. THESE CO #39558393X | Jan 22, 2027 PENDING | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Apr 14, 2026 | CONSTRUCTION FTM R/W.RUBBLE R/W SHARED W/440 JACKSON AVE & 441 CONCORD AVE AND PARTIALLY COLLAPSE AND SEVERLY DETERIORATED LOT LINE WALLS ARE SHARED MAINTAINENCE RESP ADM CODE 28-305.1.1. OWNER TO RETAIN NYSPE TO EVAL ENTIRE R/W & FILE REPAIR DWGS W/DOB. R/W TO BE PERM REPAIRED UNDER PERMIT STARTING BY MAY 18TH #RW20104HZ | DOB VIOLATION - ACTIVE |
| Jul 23, 2001 | CONSTRUCTION #011FG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | ECB | Unknown: AT TIME OF INSPECTION, OBSERVED BRICK BULGING AND CRACKING ALONG THE NORTH WALL OF 415 CONCORD AVENUE ADJACENT TO THE EXCAVATION. REQUIRED PHYSICAL EXAMINATION RECORDS FOR THE ADJOINING PROPERTY DID NOT DOCUMEN | Open |
| Aug 26, 2026 | ECB | Construction: OBSERVED PROPOSED 11STORY MIXED USE BUILDING AT DEMOLITION PHASE WITH NO ACTIVE WORK AND AN OPEN EXCAVATION WITH NO FALL PROTECTION. AT TIME OF INSPECTION I OBSERVED AN ENTRANCE DOOR UNLOCKED AND OPEN. THESE CO | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 3:13 PM ET. BBL 2025780015.