Brooklyn · Block 7106 · Lot 36 · 11223

431 Avenue U

2 floors · 2 apartments · 2,400 sq ft · built 1931 · class S2 · owner of record: 431 Avenue U Llc

3open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
434dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 313 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 434 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-14 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $3,750 owed
IssuedViolationHearingBalance
Sep 16, 2026Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS. AT TIME OF INSPECTION OBSERVED AT 2ND FLOOR, 2 CLASS A APARTMENTS BEING USED AS COMMERCIAL STORAGE, EXCESSIVE
#39204367Y
Nov 25, 2026
PENDING
$2,500
Sep 16, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT INTERIOR 2ND FLOOR APARTMENT(FRONT) CEILINGS BEDROOM & KITCHEN WATER PENETRATION CRACKS & SPALLING PLASTER CREATING HAZAR
#39204366M
Nov 25, 2026
PENDING
$1,250
DOB (1)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#25608
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026DOBCONSTRUCTION: REQUESTING ENGINEERING REPORT. AT TIME OF INSPECTION OBSERVED AT 2ND FLOOR, 2 CLASS A APARTMENTS BEING USED AS EXCESSIVE STORAGE OVERLOADING WEIGHT LIMITS FOR COMMERCIAL SPACE. REAR APARTMENT FLOOR IS SAGGING MINOR STRUCTURAL DAMAGE WITH POTENTIAL COLLAPSE STRUCTURAL STABILITY IS IN QUESTION.Closed
Sep 16, 2026ECBConstruction: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS. AT TIME OF INSPECTION OBSERVED AT 2ND FLOOR, 2 CLASS A APARTMENTS BEING USED AS COMMERCIAL STORAGE, EXCESSIVEOpen
Sep 16, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT INTERIOR 2ND FLOOR APARTMENT(FRONT) CEILINGS BEDROOM & KITCHEN WATER PENETRATION CRACKS & SPALLING PLASTER CREATING HAZAROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 4:23 PM ET. BBL 3071060036.

Look up another building