11 floors · 128 apartments · 167,410 sq ft · built 2025 · class D6 · owner of record: Zdj W 37 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 99 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 167,410 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 734). Agency page | Dec 31, 2034 in 2969 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 24, 2026 | Unknown CLASS - 2 3303.3 AT TIME OF INSPECTION OF A 11 STORIES NEW BUILDING APPROXIMATELY 16,424 SQ FEET, SITE WAS UNDER LOCK AND KEY AND THERE WAS NO CONSTRUCTION ACTIVITIES UPON SHOUTING AND BANGING ON DOORS AND FENCE TO ALER #39561004K | Dec 31, 2026 PENDING | $2,500 |
| Oct 23, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED ZERO CABLE NOT INSTALLED ON ALL UNENCLOSED PERIMETER, INSTEAD NETTING WAS NAIL DOWN WITH A PIECE OF WOOD LEAVING OPENINGS ON SYSTEM. OBSERVED ON LOCATION WHERE ENTIRE SYSTEM WAS D #39560960X | Dec 31, 2026 PENDING | $5,000 |
| Oct 23, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP. 1 AND 3. UPON COMPERING BOTH LOCATION TO APPROVED DRAWINGS NOTICE INSTALLATION DOES NOT CONFORM WITH DRAWINGS. EXP. LABEL ELEVATION D,E,F SHOWS ONL #39560967Z | Dec 31, 2026 PENDING | $1,250 |
| Aug 29, 2026 | Construction CLASS - 1 OBS. 8/29/26, 7:30-8:30 AM, ACTIVE ELECTRICAL/ELEVATOR,FRAMING, WINDOW INSTALL & SHEETROCK WORK BEFORE APPROVED 9 AM AHV START UNDER JOB M00813221-I1-GC, W/O REQ'D SSM OR CONST. SUPER ON SITE. SPANISH SPEAKING #39558529X | Dec 17, 2026 PENDING | $10,000 |
| Aug 29, 2026 | Construction CLASS - 2 OBS. SAT. 8/29/26 FROM 7:30-8:30 AM,ACTIVE ELECTRICAL, ELEVATOR, FRAMING, WINDOW INSTALLATION & SHEETROCK WORK BEFORE APPROVED 9:00 AM AHV START. ELEVATOR WORK WAS NOT LISTED IN APPROVED SCOPE. WORK EXCEEDED AP #39558528Y | Nov 5, 2026 IN VIOLATION | $1,250 |
| Jan 24, 2026 | Unknown CLASS - 2 3303.3 AT TIME OF INSPECTION OF 11 STORIES BUILDING UNDER CONSTRUCTION APPROXIMATELY 128,345 SQ FEET, SITE WAS UNDER LOCK AND KEY AND THERE WAS NO CONSTRUCTION ACTIVITIES UPON SHOUTING AND BANGING ON DOORS AND #39549494K | Jan 7, 2027 | $2,500 |
| Nov 19, 2025 | Unknown CLASS - 1 3301.5-ACTIVE SITE W MATERIAL, LARGE PILES COMBUSTIBLE CONSTRUCTION DEBRIS/GARBAGE BAGS/WOOD PLANKS/TOOL BAGS IN CELLAR RESTING ON STRUCT. RESHORES. RESHORES SUPPORT CONCRETE ABOVE, MATERIAL RESTING ON RESHORES #39547149K | Aug 7, 2026 IN VIOLATION | $5,000 |
| Nov 19, 2025 | Construction CLASS - 1 OBSERVED ONGOING SOE WORK AT EXPOSURES 1 AND 2. UPON REQUEST OF SOE PLANS, SSC/CS PROVIDED SOE PLANS THAT WERE CONTRARY AND INCOMPLETE/MISSING PAGES. RAKERS/WHALERS INSTALLED AT EXPO1 NOT SHOWN ON SOE PLANS. PL #39547150H | Mar 25, 2027 | $2,500 |
| Nov 19, 2025 | Construction CLASS - 2 OBSERVED ONGOING CONSTRUCTION OPERATIONS ON A MAJOR BUILDING CURRENTLY AT SOE/FOUNDATION PHASE. UPON REQUEST FOR DOB APPROVED SSP, THE SSP PROVIDED BY SSC/CS WAS MISSING PAGES NEEDED FOR THIS PHASE OF CONSTRUCT #39547144L | Mar 25, 2027 | $1,250 |
| Feb 13, 2025 | Unknown CLASS - 2 OBSERVED ACTIVE MAJOR BUILDING @ SOE PHASE AND CS# 029269, NOT ON-SITE FULL-TIME AS REQUIRED PER REQUIREMENTS OF MAJOR BUILDING 12-11-2024. PERMIT M00813221-SE ISSUED 12-30-2024 & PW2 SIGNED 12-27-2024, ALSO CS #39536962J | Apr 24, 2025 ADMIT/IN-VIO | $0 |
| Oct 11, 2007 | Signs Non-Hazardous OAC HAVING PROHIBITED ADVERTISING SIGNAGE IN A C DISTRICT. REMEDY: REMOVE ILLEGAL SIGNAGE. #34619645H | Jun 5, 2008 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 30, 1998 | ELEVATOR 1F2708 #9013/101110 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 14, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 4, 2024 | Parking Structures FTF-PS-INITL Failure to file sub cycle 1A parking structures compliance report by 12/31/2023, as required per 1 RCNY 103-13. | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 24, 2026 | ECB | Unknown: 3303.3 AT TIME OF INSPECTION OF A 11 STORIES NEW BUILDING APPROXIMATELY 16,424 SQ FEET, SITE WAS UNDER LOCK AND KEY AND THERE WAS NO CONSTRUCTION ACTIVITIES UPON SHOUTING AND BANGING ON DOORS AND FENCE TO ALER | Open |
| Oct 23, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED ZERO CABLE NOT INSTALLED ON ALL UNENCLOSED PERIMETER, INSTEAD NETTING WAS NAIL DOWN WITH A PIECE OF WOOD LEAVING OPENINGS ON SYSTEM. OBSERVED ON LOCATION WHERE ENTIRE SYSTEM WAS D | Open |
| Oct 23, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP. 1 AND 3. UPON COMPERING BOTH LOCATION TO APPROVED DRAWINGS NOTICE INSTALLATION DOES NOT CONFORM WITH DRAWINGS. EXP. LABEL ELEVATION D,E,F SHOWS ONL | Open |
| Oct 14, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 29, 2026 | ECB | Construction: OBS. 8/29/26, 7:30-8:30 AM, ACTIVE ELECTRICAL/ELEVATOR,FRAMING, WINDOW INSTALL & SHEETROCK WORK BEFORE APPROVED 9 AM AHV START UNDER JOB M00813221-I1-GC, W/O REQ'D SSM OR CONST. SUPER ON SITE. SPANISH SPEAKING | Open |
| Aug 29, 2026 | ECB | Construction: OBS. SAT. 8/29/26 FROM 7:30-8:30 AM,ACTIVE ELECTRICAL, ELEVATOR, FRAMING, WINDOW INSTALLATION & SHEETROCK WORK BEFORE APPROVED 9:00 AM AHV START. ELEVATOR WORK WAS NOT LISTED IN APPROVED SCOPE. WORK EXCEEDED AP | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 12:15 PM ET. BBL 1007340052.