Manhattan · Block 734 · Lot 52 · 10018

430 West 37th Street

11 floors · 128 apartments · 167,410 sq ft · built 2025 · class D6 · owner of record: Zdj W 37 Llc

12open violations
$31,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 99 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 167,410 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 734). Agency page

Dec 31, 2034
in 2969 days
Next due 2034

Open violations

ECB / OATH (11) · $31,250 owed
IssuedViolationHearingBalance
Oct 24, 2026Unknown CLASS - 2
3303.3 AT TIME OF INSPECTION OF A 11 STORIES NEW BUILDING APPROXIMATELY 16,424 SQ FEET, SITE WAS UNDER LOCK AND KEY AND THERE WAS NO CONSTRUCTION ACTIVITIES UPON SHOUTING AND BANGING ON DOORS AND FENCE TO ALER
#39561004K
Dec 31, 2026
PENDING
$2,500
Oct 23, 2026Unknown CLASS - 2
AT TIME OF INSPECTION OBSERVED ZERO CABLE NOT INSTALLED ON ALL UNENCLOSED PERIMETER, INSTEAD NETTING WAS NAIL DOWN WITH A PIECE OF WOOD LEAVING OPENINGS ON SYSTEM. OBSERVED ON LOCATION WHERE ENTIRE SYSTEM WAS D
#39560960X
Dec 31, 2026
PENDING
$5,000
Oct 23, 2026Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP. 1 AND 3. UPON COMPERING BOTH LOCATION TO APPROVED DRAWINGS NOTICE INSTALLATION DOES NOT CONFORM WITH DRAWINGS. EXP. LABEL ELEVATION D,E,F SHOWS ONL
#39560967Z
Dec 31, 2026
PENDING
$1,250
Aug 29, 2026Construction CLASS - 1
OBS. 8/29/26, 7:30-8:30 AM, ACTIVE ELECTRICAL/ELEVATOR,FRAMING, WINDOW INSTALL & SHEETROCK WORK BEFORE APPROVED 9 AM AHV START UNDER JOB M00813221-I1-GC, W/O REQ'D SSM OR CONST. SUPER ON SITE. SPANISH SPEAKING
#39558529X
Dec 17, 2026
PENDING
$10,000
Aug 29, 2026Construction CLASS - 2
OBS. SAT. 8/29/26 FROM 7:30-8:30 AM,ACTIVE ELECTRICAL, ELEVATOR, FRAMING, WINDOW INSTALLATION & SHEETROCK WORK BEFORE APPROVED 9:00 AM AHV START. ELEVATOR WORK WAS NOT LISTED IN APPROVED SCOPE. WORK EXCEEDED AP
#39558528Y
Nov 5, 2026
IN VIOLATION
$1,250
Jan 24, 2026Unknown CLASS - 2
3303.3 AT TIME OF INSPECTION OF 11 STORIES BUILDING UNDER CONSTRUCTION APPROXIMATELY 128,345 SQ FEET, SITE WAS UNDER LOCK AND KEY AND THERE WAS NO CONSTRUCTION ACTIVITIES UPON SHOUTING AND BANGING ON DOORS AND
#39549494K
Jan 7, 2027
$2,500
Nov 19, 2025Unknown CLASS - 1
3301.5-ACTIVE SITE W MATERIAL, LARGE PILES COMBUSTIBLE CONSTRUCTION DEBRIS/GARBAGE BAGS/WOOD PLANKS/TOOL BAGS IN CELLAR RESTING ON STRUCT. RESHORES. RESHORES SUPPORT CONCRETE ABOVE, MATERIAL RESTING ON RESHORES
#39547149K
Aug 7, 2026
IN VIOLATION
$5,000
Nov 19, 2025Construction CLASS - 1
OBSERVED ONGOING SOE WORK AT EXPOSURES 1 AND 2. UPON REQUEST OF SOE PLANS, SSC/CS PROVIDED SOE PLANS THAT WERE CONTRARY AND INCOMPLETE/MISSING PAGES. RAKERS/WHALERS INSTALLED AT EXPO1 NOT SHOWN ON SOE PLANS. PL
#39547150H
Mar 25, 2027
$2,500
Nov 19, 2025Construction CLASS - 2
OBSERVED ONGOING CONSTRUCTION OPERATIONS ON A MAJOR BUILDING CURRENTLY AT SOE/FOUNDATION PHASE. UPON REQUEST FOR DOB APPROVED SSP, THE SSP PROVIDED BY SSC/CS WAS MISSING PAGES NEEDED FOR THIS PHASE OF CONSTRUCT
#39547144L
Mar 25, 2027
$1,250
Feb 13, 2025Unknown CLASS - 2
OBSERVED ACTIVE MAJOR BUILDING @ SOE PHASE AND CS# 029269, NOT ON-SITE FULL-TIME AS REQUIRED PER REQUIREMENTS OF MAJOR BUILDING 12-11-2024. PERMIT M00813221-SE ISSUED 12-30-2024 & PW2 SIGNED 12-27-2024, ALSO CS
#39536962J
Apr 24, 2025
ADMIT/IN-VIO
$0
Oct 11, 2007Signs Non-Hazardous
OAC HAVING PROHIBITED ADVERTISING SIGNAGE IN A C DISTRICT. REMEDY: REMOVE ILLEGAL SIGNAGE.
#34619645H
Jun 5, 2008
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Nov 30, 1998ELEVATOR
1F2708
#9013/101110
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 14, 2026AEUHAZ FTC-AEU-HAZ
Active
Dec 4, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A parking structures compliance report by 12/31/2023, as required per 1 RCNY 103-13.
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 24, 2026ECBUnknown: 3303.3 AT TIME OF INSPECTION OF A 11 STORIES NEW BUILDING APPROXIMATELY 16,424 SQ FEET, SITE WAS UNDER LOCK AND KEY AND THERE WAS NO CONSTRUCTION ACTIVITIES UPON SHOUTING AND BANGING ON DOORS AND FENCE TO ALEROpen
Oct 23, 2026ECBUnknown: AT TIME OF INSPECTION OBSERVED ZERO CABLE NOT INSTALLED ON ALL UNENCLOSED PERIMETER, INSTEAD NETTING WAS NAIL DOWN WITH A PIECE OF WOOD LEAVING OPENINGS ON SYSTEM. OBSERVED ON LOCATION WHERE ENTIRE SYSTEM WAS DOpen
Oct 23, 2026ECBConstruction: AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP. 1 AND 3. UPON COMPERING BOTH LOCATION TO APPROVED DRAWINGS NOTICE INSTALLATION DOES NOT CONFORM WITH DRAWINGS. EXP. LABEL ELEVATION D,E,F SHOWS ONLOpen
Oct 14, 2026DOB SafetyAEUHAZ: Open
Aug 29, 2026ECBConstruction: OBS. 8/29/26, 7:30-8:30 AM, ACTIVE ELECTRICAL/ELEVATOR,FRAMING, WINDOW INSTALL & SHEETROCK WORK BEFORE APPROVED 9 AM AHV START UNDER JOB M00813221-I1-GC, W/O REQ'D SSM OR CONST. SUPER ON SITE. SPANISH SPEAKINGOpen
Aug 29, 2026ECBConstruction: OBS. SAT. 8/29/26 FROM 7:30-8:30 AM,ACTIVE ELECTRICAL, ELEVATOR, FRAMING, WINDOW INSTALLATION & SHEETROCK WORK BEFORE APPROVED 9:00 AM AHV START. ELEVATOR WORK WAS NOT LISTED IN APPROVED SCOPE. WORK EXCEEDED APOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 12:15 PM ET. BBL 1007340052.

Look up another building