5 floors · 8 apartments · 10,078 sq ft · built 2022 · class C7 · owner of record: 430 St.Marks Place Partners Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 48 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 64 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 292 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 779 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 11, 2026 | Unknown CLASS - 1 UNPERMITTED ELECTRICAL WORK AT ROOFTOP BAR AND BATHROOMS. OBSERVED AT BATHROOMS OUTLETS AND LIGHTING. AT BAR AREA MULTIPLE OUTLETS FOR COUNTER AND EQUIPTMENT. NO PERMIT FOR THIS SCOPE OF WORK ON FILE AT TIME OF #39203806M | Dec 2, 2026 PENDING | $2,500 |
| Sep 11, 2026 | Construction CLASS - 1 AT ROOFTOP THE ASBUILT CONDITIONS DO NOT CORRESPOND TO THE DWGS DATED 4/30/26 UNDER JOB #S01084134. OBSERVED 2 BATHROOMS AT EXP 2 SIDE OF ROOF. BAR AREA IS APROX HALF THE SIZE AS SHOWN ON DWGS. ALSO AT GROUND L #39203862R | Dec 2, 2026 PENDING | $2,500 |
| Sep 11, 2026 | Construction CLASS - 1 ATOI GAINED ACCESS TO BUILDING BY GENTLEMEN WHO SAID HE WAS THE SUPER OF THE BUILDING. UPON ENTERING THE ROOF TOP AREA. WE OBSERVED 2 1 PIECE BATHROOMS, 1 HANDWASH SINK AND A DOUBLE COMPARTMENT SINK BEHIND BAR #39203814M | Dec 2, 2026 PENDING | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 11, 2026 | ECB | Construction: AT THE EGRESS STAIRS A AND B DESCENDING FROM ROOF OBSERVED FURNITURE, ICE BUCKETS BOXES AND OTHER ITEMS BLOCKING CLEAR PASSAGE THROUGH THE STAIRS. PRIMARILY AT THE LEVEL 5. AT LEVEL 5 CORRIDOR DOOR TO STAIR B T | Closed |
| Sep 11, 2026 | ECB | Construction: OBSERVED ON ROOFTOP MULTIPLE LOCATIONS OF STANDUP HEATERS FULED BY 20 POUND PROPANE TANKS. APPROX 10. IT IS IL;LEGAL TO STORE OR USE 20 POUND PROPANE TANKS ON ROOF TOPS, BALCONEYS,OR TERRACES. USE OF PROPANE PR | Closed |
| Sep 11, 2026 | ECB | Construction: OBSERVED AT ROOF LEVEL THE ELEVATOR MACHINE ROOM BEING USED FOR STORAGE OF ITEMS UNREALTED TO ELEVATOR USE. CODE PROHIBITS STORAGE OF MATLS IN ROOM., REPAIR AND/REPLACE; COMPLY WITH BC CHAP 18 | Closed |
| Sep 11, 2026 | ECB | Unknown: UNPERMITTED ELECTRICAL WORK AT ROOFTOP BAR AND BATHROOMS. OBSERVED AT BATHROOMS OUTLETS AND LIGHTING. AT BAR AREA MULTIPLE OUTLETS FOR COUNTER AND EQUIPTMENT. NO PERMIT FOR THIS SCOPE OF WORK ON FILE AT TIME OF | Open |
| Sep 11, 2026 | ECB | Construction: AT ROOFTOP THE ASBUILT CONDITIONS DO NOT CORRESPOND TO THE DWGS DATED 4/30/26 UNDER JOB #S01084134. OBSERVED 2 BATHROOMS AT EXP 2 SIDE OF ROOF. BAR AREA IS APROX HALF THE SIZE AS SHOWN ON DWGS. ALSO AT GROUND L | Open |
| Sep 11, 2026 | ECB | Construction: ATOI GAINED ACCESS TO BUILDING BY GENTLEMEN WHO SAID HE WAS THE SUPER OF THE BUILDING. UPON ENTERING THE ROOF TOP AREA. WE OBSERVED 2 1 PIECE BATHROOMS, 1 HANDWASH SINK AND A DOUBLE COMPARTMENT SINK BEHIND BAR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 7:59 PM ET. BBL 5000160120.