6 floors · 90 apartments · 77,160 sq ft · built 1961 · class D1 · owner of record: 430 Realty Assoc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5376). Agency page | Dec 31, 2026 in 46 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 77,160 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 411 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-19 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 9, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910033.REM:SUBMIT ACCEPTABLE REQUIRED T #37024673L | Aug 14, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 1, 2024 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FAILURE TO CORRECT SWARMP CONDITIONS #00123 | DOB VIOLATION - ACTIVE |
| Feb 21, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #911647 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01185 | DOB VIOLATION - ACTIVE |
| May 24, 2021 | ELEVATOR #9028/703956 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #00646 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #01332 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02276 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF45967 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #35893 | DOB VIOLATION - ACTIVE |
| Apr 17, 1991 | CONSTRUCTION #12702 | VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Aug 1, 2024 | Facades FISPFCS FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 21, 2024 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 27, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Aug 30, 2026 |
| Mar 19, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Jun 22, 2026 |
| Mar 19, 2026 | A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY COVERS FOR ELECTRICAL OUTLETS AT SOUTH WALL AT PUBLIC HALL AT BASEMENT | Jun 22, 2026 |
| Mar 17, 2025 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT 1st COMPACTOR CLOSET FROM EAST, SECTION ''CELLAR'', 1st FROM SOUTH AT WEST | Apr 12, 2025 |
| Mar 17, 2025 | A | Apt 511 · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE .VISIBLE MOLD AT CAULKING, GROUTS JOINTS OF THE CERAMIC TILES AT SOUTH ,WEST AND NORTH WALLS AROUND BATHTUB, IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 511, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH' | Jun 20, 2025 |
| Mar 17, 2025 | B | Apt 511 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON THE ENTRANCE DOOR AT ROOM WITH FIRE ESCAPE WINDOW, IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 511, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Apr 21, 2025 |
| Mar 17, 2025 | B | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Apr 21, 2025 |
| Mar 14, 2025 | C | Apt 511 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 511, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Mar 14, 2025 |
| Oct 15, 2024 | B | Apt 215 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 215, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 19, 2024 |
| May 23, 2024 | B | Apt 411 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 411, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 27, 2024 |
| May 20, 2024 | B | Apt 411 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 411, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2024 |
| May 20, 2024 | A | Apt 411 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 411, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 23, 2024 |
| May 20, 2024 | B | Apt 411 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 411, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2024 |
| May 1, 2024 | B | Apt 405 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 5, 2024 |
| May 1, 2024 | B | Apt 405 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 5, 2024 |
| May 1, 2024 | B | Apt 405 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 5, 2024 |
| May 1, 2024 | C | Apt 405 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 15, 2024 |
| May 1, 2024 | B | Apt 405 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 5, 2024 |
| May 1, 2024 | B | Apt 405 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 5, 2024 |
| May 1, 2024 | B | Apt 405 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 5, 2024 |
| Feb 20, 2024 | C | Apt 405 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 5, 2024 |
| Oct 3, 2023 | C | Apt 405 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 17, 2023 |
| Oct 3, 2023 | B | Apt 405 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 7, 2023 |
| Oct 3, 2023 | B | Apt 405 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 405, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Nov 7, 2023 |
| May 12, 2023 | C | Apt 510 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 510, 5th STORY, 5th APARTMENT FROM NORTH AT EAST | May 26, 2023 |
| Jun 6, 2018 | B | Apt 511 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE , IN THE ENTRANCE LOCATED AT APT 511, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 11, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)