Manhattan · Block 1368 · Lot 36 · 10022

430 East 57 Street

15 floors · 60 apartments · 103,000 sq ft · built 1926 · class D4 · owner of record: 432 E57th St Corporation

16open violations
$7,050ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 43 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 103,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $28,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 460 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1368). Agency page

Dec 31, 2028
in 774 days
Next due 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-18 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $7,050 owed
IssuedViolationHearingBalance
Mar 4, 2026Cranes and Derricks CLASS - 2
15 STORY ALT2 FACADE WORK ACTIVE SITE.MULTIPLE SUSPENDED SCAFFOLD W/OUTRIGGER BEAMS INSTALLED/IN PLACE AT EXP#1,4 WIRE ROPES CONNECTED READILY AVAILABLE FOR USE PERMIT#M01079564.UPON RESEARCH IN DOB NOW/BIS/CRM
#39551243Z
Dec 8, 2026
$800
Mar 4, 2026Site Safety CLASS - 1
15 STORY ALT2 FACADE WORK.LARGE AREA OF FACADE PARTIALLY DEMOLISHED AT EXP#1,4 ENTIRE LENGTH OF BUILDING EXTERIOR AT 14,15 FL LARGE PLASTIC COVERING ATTACHED TO FACADE EXP#1,4.UPON REQUEST TO CONTRACTOR FOR STA
#39551242R
Dec 8, 2026
$2,500
Mar 4, 2026Construction CLASS - 2
15 STORY ALT2 FACADE ACTIVE SITE.OBSERVED NO/MISSING INADEQUATE ROOF PROTECTION OF ADJOINING PROPERTY AT EXP#4. ROOF NOT FULLY PROTECTED AS PER PLANS/CODE 3309.10. GREEN COPING PARAPET/CORNICE,NOT FULLY EXTENDE
#39551241P
Dec 8, 2026
$1,250
Mar 4, 2026Construction CLASS - 2
CD-5.15 STORY ALT2 FACADE WORK.SUSPENDED SCAFFOLDS IN PLACE AT EXP#1,4 WIRE ROPES ATTACHED BOTH PLATFORMS & UPWARD ANGLED TIE BACKS/SUSPENSION LINES, NOT INDEPENDENT UPWARD ANGLED TIE BACK SIZE NOT 4X4. NO DETA
#39551244K
Dec 8, 2026
$1,250
Mar 4, 2026Construction CLASS - 2
15 STORY ALT2 FACADE WORK ACTIVE SITE. OBSERVED SIDEWALK SHED IN PLACE AT EXP#1. UNDER PERMIT#M01105486, SHED HAD ADDITIONAL HEAVY MATERIALS/DEBRIS LARGE PALLETS OF BRICKS, CONCRETE MIXER & HOISTING EQUIP ON SH
#39551245M
Dec 8, 2026
$1,250
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (16) · C 0 · B 4 · A 12
IssuedClassViolationCorrect by
Jan 29, 2013AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHMay 4, 2013
Jan 29, 2013AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHMay 4, 2013
Jan 29, 2013AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHMay 4, 2013
Jan 29, 2013AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHMay 4, 2013
Jan 29, 2013AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHMay 4, 2013
Jan 29, 2013AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHMay 4, 2013
Jan 29, 2013BSECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR JOINTS EXTERIOR BRICK WALL, NORTH SIDE AND WEST SIDE , 15th STORYMar 5, 2013
Jan 11, 2013BApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHFeb 15, 2013
Jan 11, 2013BApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, NORTH & WEST WALLS IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHFeb 15, 2013
Jan 11, 2013BApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, SOUTH & WEST WALLS IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHFeb 15, 2013
Aug 30, 2012AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHDec 3, 2012
Aug 30, 2012AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHDec 3, 2012
Aug 30, 2012AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHDec 3, 2012
Aug 30, 2012AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHDec 3, 2012
Aug 30, 2012AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd BATHROOM FROM EAST AT NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHDec 3, 2012
Aug 30, 2012AApt 15B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd BATHROOM FROM EAST AT NORTH LOCATED AT APT 15B, 15th STORY, 1st APARTMENT FROM WEST AT NORTHDec 3, 2012

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 6:23 AM ET. BBL 1013680036.

Look up another building