Manhattan · Block 1367 · Lot 35 · 10022

430 East 56 Street

13 floors · 82 apartments · 90,000 sq ft · built 1955 · class D4 · owner of record: Sutton Manor Apts In

46open violations
$0ECB/OATH penalties owed
5HPD class C (immediately hazardous)
43dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 43 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 90,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1367). Agency page

Dec 31, 2027
in 408 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $18,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 460 days
No Cycle 10 report on record yet
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-06 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Aug 17, 1992CONSTRUCTION

#STF01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
HPD (39) · C 5 · B 28 · A 6
IssuedClassViolationCorrect by
Jun 22, 2026A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORYSep 25, 2026
Oct 6, 2025BApt PHB · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH GLASS PANE AT WEST IN THE 1st ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING SHEETROCK AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SINK IN KITCHEN ATNORTH WALL IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHEETROCK AT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE FLOOR IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHEETROCK AT ALL WALLS AND CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING AND EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHEETROCK AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025AApt PHB · § 27-2005 HMC: REFIT DOOR AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTJan 9, 2026
Oct 6, 2025BApt PHB · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 HMC: REFIT DOOR AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025CApt PHB · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTOct 12, 2025
Oct 6, 2025CApt PHB · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES PROVIDE ELECTRICT TO ALL ELECTRICAL FIXTURES IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTOct 12, 2025
Oct 6, 2025BApt PHB · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Oct 6, 2025BApt PHB · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2025
Sep 15, 2025BApt PHB · § 27-2005 HMC: REFIT DOOR TO TERRACE AT UPPER LEVEL IN THE 3rd ROOM FROM EAST LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 20, 2025
Sep 15, 2025CApt PHB · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE LOWER SASH AT 1ST WINDOW AT WEST AT UPPER LEVEL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHSep 21, 2025
Sep 15, 2025BApt PHB · § 27-2005 HMC: REFIT DOOR TO TERRACE AT UPPER LEVEL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 20, 2025
Sep 15, 2025BApt PHB · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND 1ST WINDOW AT WEST AT UPPER LEVEL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT PHB, 12th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 20, 2025
Aug 1, 2025CApt PHB · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURES AND ELECTRICAL OUTLETS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT PENTHOUSE PHB, 13th STORY, 1st PENTHOUSE FROM SOUTH AT WESTAug 7, 2025
Aug 1, 2025BApt PHB · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT PENTHOUSE PHB, 13th STORY, 1st PENTHOUSE FROM SOUTH AT WESTSep 5, 2025
Aug 1, 2025CApt PHB · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLOOR IN THE 1st ROOM FROM EAST LOCATED AT PENTHOUSE PHB, 13th STORY, 1st PENTHOUSE FROM SOUTH AT WESTAug 7, 2025
Nov 16, 2010BApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 21, 2010
Nov 16, 2010AApt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 19, 2011
Nov 16, 2010BApt 6A · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 21, 2010
Jul 24, 2008BApt 6A · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 28, 2008
Sep 12, 2007AApt PHB · § 27-2005 ADM CODE REFIT KITCHEN SINK CABINET DOORS IN THE KITCHEN LOCATED AT APT PHB, 7th STORYDec 16, 2007
Sep 12, 2007BApt PHB · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT PHB, 7th STORYOct 17, 2007
Sep 12, 2007AApt PHB · § 27-2005 ADM CODE REFIT OVEN DOORS IN THE KITCHEN LOCATED AT APT PHB, 7th STORYDec 16, 2007
Sep 12, 2007AApt PHB · § 27-2005 ADM CODE REFIT KITCHEN CABBINET DOORS IN THE KITCHEN LOCATED AT APT PHB, 7th STORYDec 16, 2007

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 5:21 AM ET. BBL 1013670035.

Look up another building