14 floors · 591 apartments · 458,572 sq ft · built 1948 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 60 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 458,572 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3794). Agency page | Dec 31, 2034 in 2982 days | Next due 2034 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: SAFE (2026-10-28) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 7, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION. RESPONDING TO AN INCIDENT THAT WORKER FINGER GOT INJURY. INVESTIGATION REVEAL THAT WORKER WAS OFF LOADING AND ON LOADING HOISTING BUCKET WHEN HIS PINKY FINGER GOT STRUCK BETWEEN BU #39552726H | Jun 17, 2026 DEFAULT | $10,000 |
| Jan 6, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTED:OBSERVED AT EXP 1(E. ELEV) AND EXP 4(N. ELEV) BROKEN WINDOWS ARE ON THE 9TH FLOOR OF EXP 1 AND ON THE 12TH FLOOR OF EXP 4. ALSO OBSERVED AT #35726165Z | Jan 21, 2026 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 2, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. IT WAS OBSERV -ED AT THE TIME OF INSPECTION BROKEN WINDOWS ON FIRST FLOOR @ EXPOSURE 1 (EAST ELEVATION) AND DETERIORATED/DAMAGED MORTAR JOINTS AT EXPOSURE 3 (WEST ELEVATION). REMEDY: REPAIR AND OR REPLACE #SR31602MA | DOB VIOLATION - ACTIVE |
| Jun 2, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED DETERIORATING MORTAR JOINTS THROUGH ALL EXPOSURES AT PARAPET. REMEDY: REPAIR AND/OR REPLACE #SR31601MA | DOB VIOLATION - ACTIVE |
| Jun 2, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED BALCONIES AT EXOSURES 1 & 3 (WEST & EAST ELEVATION) CRACKED, SPALLING AND EXPOSED REBARS AT MULTIPLE LOCATION. REMEDY: REPAIR AND/OR REPLACE #SR31603MA | DOB VIOLATION - ACTIVE |
| May 14, 2025 | CONSTRUCTION PARTIAL VACATE ORDER:OBSERVED CRACKED/SPALLED UNDERSIDE CONCRETE SLAB BALCONY AT EXPO 1 & 3, WEST & EAST ELEVATION OF ALL BALCONY LINES REMEDY: VACATE ALL BALCONY AT ALL 4 EXPOSURES, WEST, NORTH, EAST & SOUTH ELEVATIONS #LL31601YC | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01150 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01147 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01148 | DOB VIOLATION - ACTIVE |
| Feb 24, 2021 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) NYCHA CYCLE 8A FAILURE TO CORRECT SWARMP CONDITIONS #00182 | DOB VIOLATION - ACTIVE |
| Feb 20, 2020 | FACADE SAFETY PROGRAM NYCHA CYLE 8 UNSAFE REPORT FILED #HAZ88843 | DOB VIOLATION - ACTIVE |
| Feb 18, 2020 | FACADE SAFETY PROGRAM NYCHA CYLE 8 UNSAFE REPORT FILED #HAZ88769 | DOB VIOLATION - ACTIVE |
| Feb 7, 2020 | FACADE SAFETY PROGRAM #HAZ88600 | DOB VIOLATION - ACTIVE |
| Feb 7, 2020 | FACADE SAFETY PROGRAM #HAZ88599 | DOB VIOLATION - ACTIVE |
| Jan 30, 2020 | FACADE SAFETY PROGRAM #HAZ88598 | DOB VIOLATION - ACTIVE |
| Dec 2, 2006 | CONSTRUCTION #1601RG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Feb 20, 2020 | Facades FISP NYCHA CYLE 8 UNSAFE REPORT FILED | Active |
| Feb 18, 2020 | Facades FISP NYCHA CYLE 8 UNSAFE REPORT FILED | Active |
| Feb 7, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Feb 7, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jan 30, 2020 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 14, 2018 | B | Apt 10F · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 10F, 10th STORY, 4th APARTMENT FROM SOUTH AT WEST | Sep 18, 2018 |
| Jul 30, 2018 | A | Apt 7A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 2, 2018 |
| Jul 30, 2018 | A | Apt 7A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE TILES IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 2, 2018 |
| Sep 24, 2014 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 29, 2014 |
| Sep 24, 2014 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 29, 2014 |
| Sep 24, 2014 | B | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 29, 2014 |
| Mar 16, 2006 | B | Apt 6H · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, SECTION ''south corr'' | Apr 25, 2006 |
| Mar 16, 2006 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, SECTION ''SOUTH CORR'' | Apr 25, 2006 |
| Mar 16, 2006 | B | Apt 6H · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTERBALANCE, UPPER SASH, WEST 1 WINDOW IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6H, 6th STORY, SECTION ''SOUTH CORR'' | Apr 25, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 4:16 PM ET. BBL 3037940001.