1 floors · 56,616 sq ft · built 1931 · class W2 · owner of record: St Barthelomews R C C
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-28 (Accepted). Agency page | Dec 31, 2026 in 68 days | 1 of 5 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 56,616 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1571). Agency page | Dec 31, 2031 in 1894 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 10, 2026 | Construction CLASS - 2 REISSUE ON ECB #35720037R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: SPALLING PLASTER DUE TO WATER DAMAGE FROM LEAKS FROM CEILING AT ROOM #214 GIRLS RESTROOM AND RM #115 NURSES OFFICE AND ST #35732286X | May 13, 2026 POP/IN-VIO | $0 |
| Apr 10, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ILLEGAL STORAGE INSIDE BOILER ROOM/HOT WATER TANK ROOM AREA WITH A VARIETY OF ITEMS INCLUDING DESKS CHAIRS, LADDERS TOOLS, AND OTHER EQUIPMENT VERY #35732288J | May 13, 2026 POP/IN-VIO | $0 |
| Apr 10, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ILLEGAL STORAGE INSIDE ELECTRIC SWITCH GEAR ROOM WITH JANITORIAL, ELECTRONICS,AND OTHER MISC. ITEMS OBSERVED UPON INSPECTION. REMEDY: REPAIR AND/OR #35732287H | May 13, 2026 POP/IN-VIO | $0 |
| May 20, 2025 | Construction CLASS - 2 REISSUE #35682648L. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED SPALLING PLASTER DUE TO CEILING LEAKS AT RM #215 GIRLS RESTROOM, #115 NURSE OFFICE AND #117 STAFF RESTROOM. REMEDY: REPAIR AND/OR #35720037R | Jul 9, 2025 POP/IN-VIO | $0 |
| May 20, 2025 | Construction CLASS - 2 REISSUE #35682647J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED SPALLING PLASTER ON CEILING AT 3RD FLOOR STAIR "A" TO ROOF LEAK. NO COMPLIANCE WITH PAST ISSUED SUMMONS #35682647J ON 05/31/2024 #35720035N | Aug 26, 2025 IN VIOLATION | $0 |
| May 19, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED EXTERIOR DOOR AT WEST END OF SCHOOL BUILDING NOT OPENING OR CLOSING PROPERLY. RUBS ON SADDLE, REQUIRES EXCESSIVE FORCE TO OPEN AND STAYS AJAR. REMEDY: REPAIR/REPLACE DOOR. #35720030Y | Jul 29, 2025 IN VIOLATION | $0 |
| May 31, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:SPALLING PLASTER DUE TO COILING LEAK AT ROOM#215 BOYS BATHROOM,ROOM#117 AND 115.REM:MAKE NECESSARY REPAIRS. #35682648L | Aug 6, 2024 POP/IN-VIO | $0 |
| May 31, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 3RD FLOOR STAIR "A" SPALLING PLASTER AT CEILING WENT TO STAIRS DUE TO ROOF LEAK. PHOTO TAKEN. REMEDY: MAKE NECESSARY REPAIRS. #35682647J | Aug 6, 2024 DEFAULT | $0 |
| May 25, 2022 | Boilers CLASS - 2 GAS PIOLIT NOT HARD PIPED TO THE REGULATOR/FLUE COLOR MISSING CEMENT/CONDENSATE TANK VENT NOT PIPED DOWN/WIRES EXPOSED AT HWH/STORAGE AT THE BOILER;CORRECT VIOLATION AND SUBMIT THE CERTIFICATE OF CORRECTION #39062858H | Jul 12, 2022 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #10039 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 4:17 AM ET. BBL 4015710019.