7 floors · 42,000 sq ft · built 1928 · class E7 · owner of record: Third Avenue Self Storage Nyc, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 42,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $162,750 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 850 days | Filing window not open yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 20, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING EXTERIRO WALLS FACADE AND APPURTENNACES NOTE AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE 2 NORTH ELEVATION DAMAGED FACADE EXPOSURE 3 EAST ELEVATION MISSING BRICKS MULTIPLE DAMAG #35548651P | Jun 4, 2021 DEFAULT | $0 |
| Nov 2, 2020 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES SUCH AS SHED NETTING ETC WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SFATEY FORM DOCUMNETED UNSAFE FACADE TECHNICAL REPORT FILED AS UNSAFE BY PE/RA ON 9-4-20 UNSAFE FACADE AT #35443413Z | Apr 22, 2022 IN VIOLATION | $0 |
| Sep 17, 2020 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES,SUCH AS SHED,NETTING,ETC,WHERE REQUIRED TO PROTECT & SECURE PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE TECHNICAL REPORT PILED AS UNSAFE BY QEWI(OE/RA)ON 9/4/20 UNSAFE FACADE #35537878X | Apr 22, 2022 IN VIOLATION | $0 |
| Sep 17, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE & APPURTENANCES NORTH EL,EXP#2: OBSERVED CRACKED STUCCO WORK AT MULTIPLE LOCATIONS,EAST EL,EXP#3: OBSERVED STEP CRACKS & VERTICAL CRACKS AT MULTIPLE LOCATIONS,DEFECTIVE #35537877Y | Jun 4, 2021 IN VIOLATION | $0 |
| Sep 17, 2020 | Construction CLASS - 3 FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT. AT THE TIME OF MY INSPECTION THE EXTERIOR WALL CONDITION CERTIFICATE WAS NOT POSTED IN THE INTERIOR OF THE BLDG(LOBBY OR VESTIBLE ROOM). REMEDY: COMPLY W/THE CODE AS #35537879H | Jun 4, 2021 DEFAULT | $0 |
| Feb 13, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#807965.REM:SUBMIT ACCEPTABLE REQUIRED T #37018500M | Oct 23, 2020 ADMIT/IN-VIO | $0 |
| Dec 13, 2017 | Elevators CLASS - 1 05A10,39X10,100BB11,59U15,56Y13,60D07,42B09,40O02,41L10,70O02,68M07,68M07-05A10)DOOR ZONE RESTRICTOR IS INOPERATIVE. REPAIR RESTRICTOR AND CONTACT NYC DOB AT EIR@BUILDINGS.NYC.GOV. 39)REPAIR TOC LIGHT. 100)EXPI #38260184L | Feb 23, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06388 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05939 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #14838 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #35119 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #36044 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #15271 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08978 | DOB VIOLATION - ACTIVE |
| Feb 3, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00181 | DOB VIOLATION - ACTIVE |
| Dec 9, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00226 | DOB VIOLATION - ACTIVE |
| Dec 9, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00227 | DOB VIOLATION - ACTIVE |
| Sep 28, 2020 | HAZARDOUS CONDITION (FACADE) #88970 | DOB VIOLATION - ACTIVE |
| Sep 28, 2020 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS #00058 | DOB VIOLATION - ACTIVE |
| Sep 28, 2020 | HAZARDOUS CONDITION (FACADE) #99306 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04894 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #09763 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #11271 | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #01029 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #07215 | DOB VIOLATION - ACTIVE |
| Mar 31, 2008 | EMERGENCY POWER #NRF01172 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF44858 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 3, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 9, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 9, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 28, 2020 | Facades FISPFCS CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Sep 28, 2020 | Facades FISPHAZ CYCLE 8C UNSAFE REPORT FILED | Active |
| Sep 28, 2020 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Mar 31, 2008 | Emergency Power FTF-EL-ENRF | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 8:03 AM ET. BBL 2030610003.