4 floors · 10 apartments · 8,391 sq ft · built 2025 · class C1 · owner of record: Hp New Penn Housing Development Fund Com Pany, Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 18, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQUIRED BY BC CHAPTER 33AS NOTED:AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE 4 STORY BUILDING:OBSERVED AT BUILDING A STEEL PANEL STAIRCASE IN PLACE FROM 1S #35726505X | Apr 15, 2027 DEFAULT | $1,280 |
| Sep 24, 2025 | Unknown CLASS - 2 OBSERVED ACTIVE SITE WITH MULTIPLE HAZARDOUS CONDITIONS NOT ADDRESS BY CONSTRUCTION SUPERINTENDENT:CS FAILED TO PROVIDE DUTIES: NO DOCUMENTS ON SITE FOR C-HOOKS ON ROOF LEVEL,NO DESIGN DRAWINGS FOR MAKESHIFT SH #39545314X | Apr 12, 2027 | $5,000 |
| Sep 24, 2025 | Unknown CLASS - 1 OBSERVED ACTIVE SITE W/OUT OVERHEAD PROTECTION FOR ADJOINING PROPERTIES PER NEIGHBOR'S AGREEMENT JUNE 25, 2025. REVIEWING DOCUMENTS NONE WAS PROVIDED @ EXP. 4. STOP ALL WORK @ ROOF LEVEL UNDER PERMIT # 32159894 #39545298P | May 10, 2027 | $10,030 |
| Sep 24, 2025 | Construction CLASS - 1 OBSERVED ACTIVE SITE UPON REQUEST DID NOT PROVIDE APPROVE DOCUMENTS FOR C-HOOKS EXTENDED OVER THE PARAPET @ ROOF LEVEL, NO DESIGN DRAWINGS FOR MAKESHIFT SHORING @ CELLAR, 3RD & 4TH FLOOR STAIRWELL. UNDER PERMIT #39545294H | Oct 19, 2026 IN VIOLATION | $1,250 |
None open.
None open.
None open.