15 floors · 178 apartments · 263,040 sq ft · built 1924 · class D3 · owner of record: Mayflower Dev Cp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1896). Agency page | Dec 31, 2026 in 69 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $139,200 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 121 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 263,040 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 313 days | Registered through 2027-09-01 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 3, 2025 | B | Apt 14F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 14F, 14th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 7, 2025 |
| Jun 2, 2025 | B | Apt 14F · § 27-2005 HMC: REFIT CLOSET DOOR AT NORTH IN THE KITCHEN LOCATED AT APT 14F, 14th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 7, 2025 |
| Apr 3, 2025 | A | Apt 14F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET DRAWERS AT EAST WALL IN THE KITCHEN LOCATED AT APT 14F, 14th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 7, 2025 |
| Apr 3, 2025 | B | Apt 14F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 14F, 14th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 8, 2025 |
| Apr 3, 2025 | B | Apt 14F · § 27-2005 HMC: REFIT CABINET DOOR AT WEST WALL IN THE KITCHEN LOCATED AT APT 14F, 14th STORY, 2nd APARTMENT FROM WEST AT NORTH | May 8, 2025 |
| Aug 8, 2024 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER & LOWER CABINET DOORS THROUGHOUT IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 12, 2024 |
| Aug 8, 2024 | B | Apt 2C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 12, 2024 |
| Aug 8, 2024 | B | Apt 2C · § 27-2005 HMC: REFIT THE DOOR AT NORTH CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 12, 2024 |
| Aug 8, 2024 | B | Apt 2C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL-TILES FLOOR IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 12, 2024 |
| Aug 5, 2024 | B | Apt 2C · § 27-2005 HMC: REFIT THE DOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 9, 2024 |
| Aug 5, 2024 | B | Apt 2C · § 27-2005 HMC: REFIT CLOSET DOOR IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 9, 2024 |
| Aug 5, 2024 | B | Apt 2C · § 27-2005 HMC: REFIT THE DOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 9, 2024 |
| Aug 5, 2024 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 14, 2024 |
| Aug 5, 2024 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 14, 2024 |
| Aug 5, 2024 | B | Apt 2C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE OF THE WASH/BASIN IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 9, 2024 |
| Aug 5, 2024 | B | Apt 2C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE OF THE BATHTUB IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 9, 2024 |
| Aug 5, 2024 | B | Apt 2C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 9, 2024 |
| Jan 6, 2023 | B | Apt 10A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 10A, 10th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' | Feb 10, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 10:22 AM ET. BBL 1018960043.