4 floors · 7 apartments · 6,064 sq ft · built 2019 · class C7 · owner of record: Barnes & Levi Sobo Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 17, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN: THE ADJACENT ALLEY EXPOSURE 2 A 16'X8' SECTION OF PLYWOOD FENCE FELL AT TIME OF INSPECTION, REPAIR AND/REPLACE #39133167Y | Aug 29, 2025 IN VIOLATION | $2,500 |
| Oct 11, 2019 | Construction CLASS - 1 FAILURE TO INSTITUE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION -(NO/INAEQUATE GUARDRAILS) @THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE. I OBSERVED THE GUARD RAILS @EXPO#1 & #3, WHICH WAS #35460445H | Apr 9, 2021 IN VIOLATION | $2,500 |
| Oct 11, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN (UNCAPPED REBARS) @THE TIME OF MY INSPECTION ON ANACTIVE-JOBSITE OF A PROPOSED 4 STY BUILDING CURRENTLY @FOUNDATION PHASE. I OBSERVED @ALL 4 EXPOSURES UNCAPPER REBARS AROUND THE PERIMETER OF #35460444X | Apr 9, 2021 IN VIOLATION | $2,500 |
| Jan 28, 2019 | Construction CLASS - 1 BC3309.1 FAILURE TO PROTECT ADJOINING PROPERTY. AT TIME OF INSPECTIONOBSERVED AT JOBSITE AT EXCAVATION STAGE. DURING INSPECTION NOTED THAT THE CONSTRUCTION FENCE LOOKS LIKE IT WILL COLLAPSE DUE TO EXCAVATION #35376745H | Jun 28, 2019 DEFAULT | $6,250 |
| Nov 2, 2018 | Construction CLASS - 2 BC3304.2.FAILURE TO ADEQUATELY SUPPORT ADJOINING GROUND AT TIME OF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK IN PROGRESS.DURING INSPECTION NOTED THAT THE GC EXCAVATED DEEPER THAN THE #35367179H | Jun 14, 2019 DEFAULT | $3,125 |
| Nov 2, 2018 | Construction CLASS - 1 BC3304.3.1.NO RULES 52.AT TIME OF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK IN PROGRESS.DURING INSPECTION NOTED THAT THE CONTRACTOR EXCAVATED NEXT TO THE ADJOINNG PROPERTY WITHOUT NOT #35367180P | Jun 14, 2019 DEFAULT | $6,250 |
| Nov 2, 2018 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.AT TIME OF INSPECTION OBSERVED AN ACTIVE SITE WITH EXCAVATION WORK IN PROGRESS.DURING INSPECTION NOTED THAT AN EXISTING FOUNDATION WALL SUPPOSED TO REMAI #35367181R | Jun 14, 2019 DEFAULT | $3,125 |
| Oct 2, 2018 | Construction CLASS - 2 BC3301.7.FAILURE TO PROVIDE CONSTRUCTION DOCUMENTS AT JOB SITE.AT TIMEOF INSPECTION OBSERVED AN ACTIVE CONSTRUCTION SITE WITH EXCAVATION WORK IN PROGRESS.DURING INSPECTION I REQUESTED FOR MONITORING REPORTS FOR #35367178X | Jun 14, 2019 DEFAULT | $3,125 |
| Aug 20, 2018 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS (SOE) AT TIMEOF INSPECTION NOTED EXCAVATION AT EXP#2 APPRX 6 TO 7 FT DOWN AND APPRX10'TO 15' LENGTH NO SUPPORT OR EXCAVATION. AS PER PLANS THE SOLDER PIL #35350625H | Apr 12, 2019 IN VIOLATION | $2,500 |
| Aug 20, 2018 | Construction CLASS - 1 FAILURE TO NOTIFY THE DEPT PRIOR TO COMMENCEMENT OF EARTHWORK (RULE 52AT TIME OF INSPECTION NOTED EXCAVTION APPRX 6' 5O 7' BELOW GRADE,NO RULE 52 HAS BEEN SUBMITTED TO THE DEPT PRIOR TO THE START OF EXCAVATIO #35350626J | Oct 19, 2018 DEFAULT | $3,720 |
| Issued | Violation | Status |
|---|---|---|
| May 18, 2022 | CONSTRUCTION AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ROOF BULK HAED AND CELLAR DUE TO FIRE AT ADJACENT PROPERTY AT 420 EAST 143R D STREET #CER05GS | DOB VIOLATION - ACTIVE |