421,996 sq ft · class Y1 · owner of record: Fire Department Of New York
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 421,996 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5917). Agency page | Dec 31, 2027 in 435 days | Next due 2027 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 19, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT EXP.2 AND 4 OF SECURITY BOOTH. OBSERVED RAIN LEADER PIPES ARE NOT PROPERLY CONNECTED TO A STORM DRAIN/DRYWELL, CAUSING RAIN/RUNOFF WATER TO IMPR #39181030J | Apr 7, 2026 POP/IN-VIO | $0 |
| Apr 24, 2025 | Construction CLASS - 1 AT THE TIME OF INSPECTION OBSERVED FULLY DEMOLISHED 2 STORY BUILDING. UPON RESEARCHING DOB RECORDS NO NOTIFICATION WAS GIVEN PRIOR TO COMMENCE OF FULL DEMOLITION. AS PER BC 3306.3 GC MUST NOTIFY THE DEPARTMENT #39539554Y | Oct 16, 2026 DEFAULT | $12,500 |
| Aug 23, 2021 | Boilers CLASS - 2 UN REG BLR,MISSING SPILL SWITCH,SEAL HOLES,DOOR NOT SELF CLOSING,OPEN BSMT NO COMB AIR,INSULATE PIPES,COVER OIL LINES,CLN OUT MISSING,MISSING THERMOMETER FOR DOM HOT WTR, MAINTAIN BOILER; CORRECT ALL VIOLATIONS #39046447N | Sep 14, 2021 POP/IN-VIO | $0 |
| Jun 29, 2021 | Boilers CLASS - 2 BOILER NOT REGISTED ,ROOM NOT FIRE PROOFED ,DOOR AT BASE OF CHIMNEY DOES NOT STAY CLOSED,HB SMITH BOILER 28-HE-5 1,458.00 BTUS, MAINTAIN BOILER; CORRECT ALL VIOLATIONS SEND IN CERTIFICATE OF CORRECTION #39043658J | Jul 1, 2021 POP/IN-VIO | $0 |
| Jun 29, 2021 | Boilers CLASS - 2 BOILER NOT REGISTED,NO COMBUSTION AIR,FIRE PROOF ROOM,MISSING STOPPER & SPILL SWITCH ON BAROMETRIC,MISSING ISOLATION ON RETURN,ANCHOR DOWN OIL TANKS FLOOD ZONE,DOOR NOT EGRESS TO BLR ROOM,CLEAN BASE OF CHIMNEY, #39043640L | Jul 1, 2021 POP/IN-VIO | $0 |
| Apr 8, 2021 | Elevators CLASS - 1 1. WHEELCHAIR LIFT DOES NOT WORK , PLATFORM DOES NOT OPEN . 2. PROVIDE MAINTENANCE LOG / MCP . 3 . EXPIRED CAT 1 TEST TAG. PERFORM &FILE TEST. #39038998J | Apr 15, 2021 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 12, 2025 | CONSTRUCTION EMERGENCY WORK ORDER-THE BLDG ROOF PARTIALLY COLLAPSED(APPROX 50%) REMAINDER OF ROOD IS IN STATE OF DISREPAIR &ACTIVELY COLLAPSING.BEARNG WALLS ARE IMPROPERLY BRACED.IMMED INSTALL A TIGHT BOARD FENCE AS A MIN 8'+/- APART FROM BLDG FACADE TO ESTABB COLLAPSE ZONE,FILE/PERMIT JOB #FEU40701FF | DOB VIOLATION - ACTIVE |
| Dec 12, 2025 | CONSTRUCTION FULL VACATE-THE LDG HAS THE ROOF PARTIALLY COLLAPSED(APPROX50%)& REMAINDER OF ROOF IS IN STATE OF EXTREME DSREPAIR&ACTIVELY COLLAPSING BEARING WALLS ARE IMPROPERLY BRACED.FULL VACATE THE PREMISE #FEU40702FF | DOB VIOLATION - ACTIVE |
| Dec 12, 2025 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG ROOF IS PRTLLY CLLPSD(APPROX50%)W/ REMAINDR OF ROOF IN STTAE OF DSRPAIR&ACTIVELY CLLPSNG 1SLY HORIZNTL EXT IS DTACHNG FRM MAIN BLDG&HAS VERTICAL CRCKS FRM GRND RO ROOF.IMMED DEMO THE BLDG DOWN TO GRADE BY ENDRSD CNTRCTR UNDR THE CNTINUOUS SPRVSN OF A NYSPE ON SITE FOLLW #FEU40703FF | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19219 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19218 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19220 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19402 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19403 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17810 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17984 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17983 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17811 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17809 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #32375 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #44344 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #36923 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #23392 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #16780 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #42087 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #36925 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #36924 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #16782 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #16781 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #21682 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #42829 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #23527 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #18078 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #18079 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #38285 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #43083 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #18077 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #25133 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #38284 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #44549 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19601 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #23768 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #23405 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #23406 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #23408 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #23407 | DOB VIOLATION - ACTIVE |
| Jul 7, 2022 | CONSTRUCTION BLDG HAS MULTI HOLES @ROOF.CHIMNEY PARTLY COLLPSD.REMAINDER ROOF IN SEVERE STATE OF DISRPR.PERIMETER IMPROPRLY BRACD.VEGETATION IS GROWNG IN & OUT OF BLDG.BLDG STRCTURALLY COMPROMISD & DANGR TO PUBLIC FULL VACATE THE PREMISES #FEU40702YS | DOB VIOLATION - ACTIVE |
| Jul 7, 2022 | CONSTRUCTION EWO-BLDG HAS MULTI HOLES @ROOF.CHIMNEY PARTLY COLLPSD REMAINDER ROOF IN SEVRE STATE DISRPR.PERIMETR IMPROPRLY BRACD.VEGETATN IS GROWNG IN & OUT OF BLDG.BLDG STRCTRLLY COMPROMISD & DANGR TO PUBLIC IMMED DEMO BLDG DOWN TO GRADE UNDR CONTINUOUS SUPRV OF NYSPE FILE & PRMT DEMO JOB COMPLYING W/NYS CODES #FEU40701YS | DOB VIOLATION - ACTIVE |
| Jul 7, 2022 | CONSTRUCTION EWO-BLDG HAS MULTI HOLES @ROOF.CHIMNEY PARTLY COLLPSD REMAINDER ROOF SEVRE STATE DISRPR.PERIMETR IMPROPRLY BRACD.VEGETATNIS GROWNG IN & OUT OF BLDG.BLDG STRCTRLLY COMPROMISD & DANGR TO PUBLIC IMMED DEMO BLDG DOWN TO GRADE UNDR CONTINUOUS SUPRV OF NYSPE .FILE & PRMT DEMO JOB COMPLYING W/NYS CODES #FEU40703YS | DOB VIOLATION - ACTIVE |
| Jul 7, 2022 | CONSTRUCTION BLDG HAS MULTI HOLES @ROOF.CHIMNEY PARTLY COLLPSD.REMAINDE ROOF IN SEVERE STATE OF DISRPR.PERIMETER IMPROPRLY BRACD.VEGETATION IS GROWING IN AND OUT OF BLDG.BLDG STRUCTURALLY COMPROMISD & DANGR TO PUBLIC FULL VACATE THE PREMISES #FEU40704YS | DOB VIOLATION - ACTIVE |
| Jun 22, 2022 | CONSTRUCTION EMERGENCY WORK ORDER-BLDG HAS MULTIPLE HOLES @ROOF,VEGETATION THROUGH REMAINDER OFF ROOF IN SEVERE STATE OF DISREPAIR THE BLDG STRUCTURALLY COMPROMISED AND REPRESENTS DANGER TO PUBLIC IMMED INSTALL A TIGHT BOARD FENCE AS A MIN 8'+/- APART FROM BLDG WALL TO ESTABLISH A COLLAPSE BASE. FILE & PERMIT JO #FEU40701YS | DOB VIOLATION - ACTIVE |
| Jun 22, 2022 | CONSTRUCTION EMERGENCY WORK ORDER-BLDG HAS MULTIPLE HOLES AT ROOF WITH VEGETATION GROWING THROUGH. REMAINDER OF ROOF IS IN SEVERE STATE OF DISREPAIR WHICH LEAVES PERIMETER WALL IMPROPERLY BRACED IMMED DEMOLISH THE BLDG DOWN TO GRADE UNDER THE CONTINUOUS SUPERV OF NYSPE. FILE AND PERMIT DEMOLITION. COMPLY W/CODE #FEU40702YS | DOB VIOLATION - ACTIVE |
| Jun 22, 2022 | CONSTRUCTION FULL VACATE-THE BLDG HAS MULTIPLE HOLES AT ROOF W/VEGETATION GROWING THROUGH. REMAINDER OF ROOF IS IN SEVERE STATE OF DISREPAIRWHICH LEAVES PERIMETER WALLS IMPROPERLY BRACED FULL VACATE THE PREMESIS #FEU40703YS | DOB VIOLATION - ACTIVE |
| Oct 6, 2021 | CONSTRUCTION EMERGENCY WORK ORDER-THE BLDG HAS ROOF PARTIALLY COLLAPSED(APPROX 70%) REMAINDER OF ROOF IS IN STATE OF DISREPAIR AND ACTIVELYCOLLASPSING IMMED DEMOLISH THE BLDG DOWN TO GRADE UNDER THE CONTINUOUS SUPERV OF NYSPE. FILE/PERMIT PERMIT DEMOLITION JOB #FEU40704FF | DOB VIOLATION - ACTIVE |
| Oct 6, 2021 | CONSTRUCTION EMERGENCY WORK ORDER-THE BLDG HAS ROOF PARTIALLY COLLAPSED(APPROX 70%) REMAINDER OF ROOF IS IN STATE OF EXTREME DISREPAIR &ACTIVELY COLLAPSNG REFER TO PREVIOUS DOB VIO 100621FEU40703FF 50%ROOF COLLAPSED REMAINDER STATE-EXTENSIVE DISREPAIR FULL VACATE OF PREMISES #FEU40706FF | DOB VIOLATION - ACTIVE |
| Oct 6, 2021 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG HAS ROOF PARTIALLY COLLAPSED(APPROX 50%) AND REMAINDER OF ROOF IS IN STATE OF DISREPAIR ANDACTIVELY COLLAPSING IMMED INSTALL A TIGHT BOARD FENCE AS A MINIMUM 30' +/- APART FROM BLDG FACADE TO ESTABLISH A COLLAPSE ZONE #FEU40701FF | DOB VIOLATION - ACTIVE |
| Oct 6, 2021 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG HAS ROOF PARTIALLY COLLAPSED(APPROX 50%) &REMAINDER OF ROOF IS IN STATE OF EXTREME DISREPAIR ANDACTIVELY COLLAPSING.IMMED DEMOLISH THE BLDG DOWN TO GRADE UNDER THE CONTINUOUS SUPERV OF NYSPE. FILE AND PERMIT DEMOLITION JOB #FEU40702FF | DOB VIOLATION - ACTIVE |
| Oct 6, 2021 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG HAS ROOF PARTIALLY COLLAPSED(APPROX 50%) AND REMAINDER OF ROOF IS IN STATE OF DISREPAIR ANDACTIVELY COLLAPSING REFER TO PREVIOUS DOB VIO 100621FEU40701FF 50% ROOF COLLAPSD&REMAINDER STATE-EXTENSIVE DISREPAIR.FULL VACATE OF PREMISES #FEU40705FF | DOB VIOLATION - ACTIVE |
| Jan 17, 2020 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #02758 | DOB VIOLATION - ACTIVE |
| Jan 17, 2020 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #02757 | DOB VIOLATION - ACTIVE |
| Jan 17, 2020 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #02825 | DOB VIOLATION - ACTIVE |
| Jan 17, 2020 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #02756 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #15173 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | ELEVATOR #9027/648980 | DOB VIOLATION - ACTIVE |
| Apr 5, 2019 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST #03991 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #15421 | DOB VIOLATION - ACTIVE |
Showing 60 of 76. Full list on the agency site.
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Jan 17, 2020 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jan 17, 2020 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jan 17, 2020 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 7:20 AM ET. BBL 4059170001.