2 floors · 12,435 sq ft · built 1885 · class M1 · owner of record: Trinity Presbyterianch
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-16 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 29, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED EXPOSURE #1 AT FACADE IN STATE OF DISREPAIR ,WINDOWS SILLS ARE CRACKED AND CAN BE FELL DOWN ON PUBLIC PATHWAY ALSO FAILURE TO COMPLY AND SUBMIT CERTIFICATE OF CORRECTION FOR VIOLA #39165220K | Jan 8, 2026 DEFAULT | $25,000 |
| Oct 29, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED FACADE AT EXPOSURE 1 IN STATE OF DISREPAIR ,WINDOWS SILLS ARE CRACKED AND CAN BE FELL DOWN ON PUBLIC PATHWAY ALSO FAILURE TO COMPLY AND SUBMIT CERTIFICATE OF CORRECTION FOR VIOLAT #39165219N | Jan 8, 2026 DEFAULT | $25,000 |
| Jun 23, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED FACADE AT EXPO.1 IN STATE OF DISREPAIR WITH DELAMINATION OF MASONRY WINDOW SILLS, CRACKED AND/OR MISSING SECTIONS OF STUCCO #39518217K | Oct 24, 2023 DEFAULT | $6,250 |
| Mar 3, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION NOTED FACADE EXPOSURE#1 IN STATE OF DISREPAIR WITH DELAMANTION OF MASONRY WINDOWSILLS AND BROKEN AND OR MISSING SECTIONS OF GLASS WIND #35636145M | Jun 2, 2022 DEFAULT | $6,250 |
| Dec 16, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED AT FRONT OF BUILDING EXP #1 WINDOW SILLS AND CONCRETE MALDING AND WALL AT 4TH FLOOR LEVEL (LEFT SIDE)CRACKED,DISREPAIR NOT MA #35636114J | Mar 17, 2022 DEFAULT | $12,500 |
| Nov 4, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT FRONT FACADE EXP1 WINDOW SILLS AND CONCERTE MOLDING IN STATE OF DISREPAIR WITHSPALLING AND CRACKED CONCRETE THROUGHOUT ENTIRE BUILDING FROM 1ST FLOO #35586968K | Feb 3, 2022 DEFAULT | $12,500 |
| Sep 2, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING CODE COMPLIANT MANNER.AT TIME OF INSPECTION NOTED FACADE AT EXPOSURE#1 IN STATE PF DISREPAIR WITH DELAMANANTION OF STUCCO ALSO AT EXPOSURE#1 NUMEROUS WINDOW WITH BROKEN AND/OR MISSI #35586699L | Dec 2, 2021 DEFAULT | $12,500 |
| Jul 8, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION NOTED FACADE AT EXP1 NUMEROUS LOCATIONS WITH DELAMINATED AREAS OR MISSING MASONRY.ALSO AT EXP1 MULTIPLE CRACKS WITH BROKEN AND/OR MISS #35584133N | Sep 23, 2021 DEFAULT | $12,500 |
| Jun 1, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION.NOTED:FACADE AT EXP #1 DECIMANATION OF STUCCO AND BROKEN AND/OR MISSING GLASS WINDOW PANES THROUGHOUT ENTIRE FACADE.REMEDY:COMPLY WITH #35561207P | Aug 19, 2021 DEFAULT | $6,250 |
| Apr 14, 2021 | Construction CLASS - 1 FAIILURE TO MAIANTAIN BLDG IN CODE COMPLIANT MANNER-AT TIME OF INSPECTION. NOTED: AT EXP#1 DELAMATING STUCCO AT NUMEROUS DECORATIVE LOCATIONS ALSO NUMBEROUS WINDOWS HAVE BROKEN UNSAFE GLASS PANELS. #35553981Y | Jul 1, 2021 DEFAULT | $12,500 |
| Feb 22, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCE. NOTE: AT EXP#1 FRONT FACADE OBSERVED CRACKED WINDOW SILLS TO DECORATIVE MOULDINGS THROUGHOUT ENTIRE BLDG. RMEEDY: MAINTAIN BLDG EXTERIOR WALLS. #35546164Z | Sep 16, 2021 DEFAULT | $25,000 |
| Issued | Violation | Status |
|---|---|---|
| Mar 16, 2022 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00106 | DOB VIOLATION - ACTIVE |
| Feb 2, 2022 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00097 | DOB VIOLATION - ACTIVE |
| Nov 24, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00100 | DOB VIOLATION - ACTIVE |
| Sep 29, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00107 | DOB VIOLATION - ACTIVE |
| Sep 1, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00107 | DOB VIOLATION - ACTIVE |
| Jul 7, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00127 | DOB VIOLATION - ACTIVE |
| May 26, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00157 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #01879 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #05415 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #06141 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Mar 16, 2022 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 2, 2022 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 24, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 29, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 1, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 7, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| May 26, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 6:24 AM ET. BBL 1010660043.