1 floors · 12,300 sq ft · built 1926 · class M1 · owner of record: Faith Temple Church/Living God
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 15, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED AT ELEVATION/EXPOSURE 4, THE CHIMNEY WITH PARTLY DISLODGED BRICKS MISSING MORTAR, VERTICAL CRACKS ALONG THE MIDDLE AND TOP PORTION, AND AT RISK #35718974Z | Jul 31, 2026 DEFAULT | $12,500 |
| Mar 10, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, OBSERVED AT CHIMNEY LEVEL, EXPOSURE #1, DISLODGED BRICKWORK, DETERIORATED MORTAR JOINTS, STEP CRACKING, AND SEPARATION OF MASONRY UNITS. CONDITION INDICATES STRUCTURAL INSTABILITY OF THE #39179903R | May 15, 2026 DEFAULT | $25,000 |
| Jul 25, 2024 | Construction CLASS - 1 OBSERVED ON ROOF LEVEL DISLODGE BRICKS, MORTAR AND ALSO STEP CRACKS AT EXPOSURE 1 AND EXPOSURE 2 AT CHIMNEY. ALSO AT EXPOSURE 1 THERE IS COMPLETE SEPARATION OF BRICKS AND MORTAR. THIS CAUSES A SERIOUS RISK TO T #39119895L | Dec 20, 2024 DEFAULT | $6,250 |
| Jul 25, 2024 | Construction CLASS - 1 UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35667033J ISSUED ON 09/01/2023 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01., COMPLY #39119894J | Dec 20, 2024 DEFAULT | $6,250 |
| Sep 1, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER OBSERVED ON ROOF LEVEL DISLODGED BRICKS, MORTAR AND STEP CRACKS AT EXPOSURE 1 AND ALSO EXPOSURE 2 AT CHIMNEY. ALSO AT EXPOSURE 1 OF CHIMNEY THERE IS COMPLET #35667033J | Aug 16, 2024 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| May 15, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD SEVERAL CRACK AND MISSING MORTAR THROUGHOUT EXP1 AND @ EXP1/2 CORNER. OWNER TO IMMED RETAIN RDP IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 6/15/26 #PI21201TC | DOB VIOLATION - ACTIVE |
| Sep 1, 2023 | CONSTRUCTION OBSERVED ON ROOF LEVEL DISLODGED BRICKS, MORTAR AND STEPS CRACKS AT CHIMNEY. THE STEP CRACKS START AT APPROXIMATELY 4 FT FROM TOP CHIMNEY AT EXPOSURE 1 AND ALSO EXPOSURE 4. AT EXPOSURE 1 OF CHIMNEY THERE IS COMPLETE SEPARATION OF BRICKS AND MORTAR. THIS CAUSES A SERIOUS RISK TO THE ADJACENT PROPERTI #23-02513 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 3:53 AM ET. BBL 2049970061.