Manhattan · Block 2060 · Lot 18 · 10031

421 West 145 Street

16,530 sq ft · built 1988 · class M1 · owner of record: Mt Zion Evangelical Lutheran Church

12open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-03 (Accepted). Agency page

Dec 31, 2026
in 47 days
1 of 2 without an accepted 2026 report yet

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Dec 22, 2014Construction CLASS - 2
FAILURE TO MAINTAIN BLDG FACADE AND APPURTENANCES. DEFECTS NOTED:AT THE NORTH-WEST AREA OF THE FRONT YARD.SEPARATION OF EXTERIOR WALL FROM THE SLAB ON GRADE HAS CREATED A 2 SF HOLE AT THE SLAB,VERTICAL AND HOR
#35119353L
May 21, 2015
IN VIOLATION
$0
Aug 29, 2014Construction CLASS - 1
FAILURE TO MAINTAIN BLDG FACADE & APPURTENANCES. DEFECTS NOTED: AT THENORTH-WEST AREA OF THE FRONT YARD,SEPARATION OF THE EXTERIOR WALL FROMTHE SLAB ON GRADE HAS CREATED A 2 SF HOLE AT THE SLAB & VERTICAL AND
#35026309L
Oct 16, 2014
IN VIOLATION
$0
DOB (5)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#27978
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#02774
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#01996
DOB VIOLATION - ACTIVE
Nov 20, 2014FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00087
DOB VIOLATION - ACTIVE
Mar 1, 2013LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
#03375
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Nov 20, 2014AEUHAZ FTC-AEU-HAZ
Active
Mar 1, 2013Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 13, 2026, 11:37 PM ET. BBL 1020600018.

Look up another building