3 floors · 93,300 sq ft · built 1964 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 93,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1700). Agency page | Dec 31, 2030 in 1504 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 22, 2026 | Construction CLASS - 2 REISSUED ECB#35676342H FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF WALL WITH CRACKS AND MISSING MORTAR THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR REPLACE. #35736114H | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 22, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:AT 1ST FL EXITS2,9,AUDITORIUM INSTALLED/USED EYE/HOOK DOOR STOPPERS.REM:PROVIDE LEGAL #35736118P | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 22, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 3RD FL STAIR C,SMOKE DOORS RM 308 2ND FL STAIR C SMOKE DOORS RM 236 1ST FL CAFETERIA,STAIR B ALL DOOR ARE IN DISREPAIR/RACKED.REM:REPAIR AND/OR REP #35736115J | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 22, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 2ND FL LIBRARY RM 209 NOT INSTALLED/PROVIDED WITHOUT #35736116L | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 22, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED AT 1ST FL GYM,AUDITORIUM AND EVERY FLOOR/AREAS EMERGENCY LIGHTS/EXIT S #35736117N | Aug 20, 2026 POP/IN-VIO | $0 |
| Jul 18, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT ROOF LEVEL ADJACENT TO BULKHEAD C, THE CORNER WALL HAS CRACKS AND MISSING MORTAR. AT EXPOSURE 1 ABOVE HANDICAP RAMP, HAS CRACKS AND A HOLE. ALSO, ABO #35676342H | Oct 12, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 28, 2023 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED FOUR METAL SUPPORT BEAMS AND CROSS BRACING DEFECTIVE AND DISPLACED SECTION DAMAGED APPROX 10FTX20FT DUE TO CAR IMPACT #23-00563 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01470 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 22, 2026 | ECB | Construction: REISSUED ECB#35676342H FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF WALL WITH CRACKS AND MISSING MORTAR THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR REPLACE. | Open |
| Jul 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:AT 1ST FL EXITS2,9,AUDITORIUM INSTALLED/USED EYE/HOOK DOOR STOPPERS.REM:PROVIDE LEGAL | Open |
| Jul 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 3RD FL STAIR C,SMOKE DOORS RM 308 2ND FL STAIR C SMOKE DOORS RM 236 1ST FL CAFETERIA,STAIR B ALL DOOR ARE IN DISREPAIR/RACKED.REM:REPAIR AND/OR REP | Open |
| Jul 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 2ND FL LIBRARY RM 209 NOT INSTALLED/PROVIDED WITHOUT | Open |
| Jul 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED AT 1ST FL GYM,AUDITORIUM AND EVERY FLOOR/AREAS EMERGENCY LIGHTS/EXIT S | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 4:46 AM ET. BBL 1017000001.