5 floors · 38 apartments · 29,274 sq ft · built 1900 · class C7 · owner of record: 421 Audubon Partners Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-06 (Accepted). Agency page | Dec 31, 2026 in 61 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 29,274 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2023 | Construction CLASS - 3 FAILURE TO MAINTAIN. OBSERVED AT EXPOSURE#1, WINDOW A/C UNITS ON FLOORS 2,3,4 AND 5 ARE MISSING SUPPORT BRACKETS. OBSERVED AT EXPOSURE#4, WINDOW A/C UNITS ON FLOORS 3,4 AND 5 ARE MISSING SUPPORT BRACKETS, REPAI #39095533K | Dec 14, 2023 DEFAULT | $0 |
| Mar 18, 2009 | Unknown CLASS - 3 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER NOTED: INSTALLED COOKING VENTILATION FAN ON SIDE OF BLDG W/I 10' OF RESIDENTIAL WINDOW CONTRARY TO REQUIREMENTS SET FORTH IN MECHANICAL CODE 401.5.2. REMEDY: #34766053Y | May 8, 2009 IN VIOLATION | $0 |
| Oct 24, 2007 | Construction Non-Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG DEPT REC.OBSERVED:IN SUPER'S APT 3 BDRMS WITH DEAD BOLTS.NO WINDOWS IN ANY BDRMS,BDRMS CONSTRUCTED IN GAS METER AREA OF BASEMENT 2 BDRMS VIEWED VIA DIRECT ACCESS 3RD #34617595J | Dec 13, 2007 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #15599 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #07756 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #28930 | DOB VIOLATION - ACTIVE |
| Jan 6, 2022 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ISSUED A SWO FOR APP #123705375, DUE TO APPLICANT WITHDRAWAL. STOP ALL WORK AND MAKE SITE SAFE IMMEDIATELY. ACCESS NOT PROVIDED TO APT #31 DURING INSPECTION. #22-00029 | DOB VIOLATION - ACTIVE |
| Oct 24, 2007 | CONSTRUCTION #12DB02 | DOB VIOLATION - ACTIVE |
| Oct 24, 2007 | CONSTRUCTION #12DB03 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 31, 2026 | B | Apt 42 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| Aug 31, 2026 | B | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, EAST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| Aug 31, 2026 | B | Apt 42 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| Aug 31, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | Sep 6, 2026 |
| Aug 31, 2026 | B | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR DOOR FRAME AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| Aug 31, 2026 | B | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR DOOR FRAME AT EAST WALL IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| Aug 25, 2026 | C | Apt 42 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2026 |
| Aug 25, 2026 | B | Apt 42 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 29, 2026 |
| Aug 25, 2026 | A | Apt 42 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 28, 2026 |
| Aug 25, 2026 | B | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 29, 2026 |
| Aug 25, 2026 | B | Apt 42 · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 29, 2026 |
| Aug 25, 2026 | B | Apt 42 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 29, 2026 |
| Aug 25, 2026 | B | Apt 42 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 29, 2026 |
| May 18, 2026 | B | Apt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 32, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 22, 2026 |
| May 11, 2026 | C | Apt 31 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 31, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 8, 2026 |
| May 11, 2026 | C | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 6, 2026 |
| Jan 13, 2026 | C | Apt 24 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 24, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 10, 2026 |
| Dec 29, 2025 | C | Apt 24 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Dec 28, 2025 |
| Nov 19, 2025 | C | Apt 24 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Nov 19, 2025 |
| Nov 10, 2025 | B | Apt 24 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 24, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18078683 ISSUED 10-JUL-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017 | Dec 15, 2025 |
| May 12, 2025 | B | Apt 51 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 16, 2025 |
| May 12, 2025 | B | Apt 32 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 16, 2025 |
| May 7, 2025 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | May 11, 2025 |
| May 7, 2025 | C | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | May 11, 2025 |
| Jan 29, 2024 | B | Apt 42 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 15 SQ.FT AT CEILING AND 10 SQ.FT AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 4, 2024 |
| Sep 11, 2023 | B | Apt 21 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 16, 2023 |
| Aug 31, 2023 | C | Apt 22 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 22, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 26, 2023 |
| Aug 31, 2023 | C | Apt 22 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 22, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 26, 2023 |
| May 19, 2021 | B | Apt 52 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL AT BATHTUB IN THE BATHROOM LOCATED AT APT 52, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 23, 2021 |
| May 19, 2021 | C | Apt 21 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 14, 2021 |
| Jun 5, 2008 | B | Apt 44 · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 44, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jul 10, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, EAST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 31, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, EAST AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 31, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | Open |
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR DOOR FRAME AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR DOOR FRAME AT EAST WALL IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 25, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 25, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 25, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 25, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 25, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 25, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Aug 25, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 4:49 PM ET. BBL 1021560066.